

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Thermal Product Solutions Laboratory Oven LO-90-P
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Laboratory Oven Cleaning
Cleaning Instructions
Ensure cleaning solution does not contain aggressive ions
Thoroughly wash all surfaces with an appropriate cleaning solution
Thoroughly rinse all surfaces
Take precaution not to spray beyond the blower outlet when cleaning the conditioning plenum
Door Gasket Replacement
Initial Screw Removal
Remove the first screw located behind the gasket at the bottom of the door frame
Remove the next two screws working to the right
Gasket Removal and Installation
Pry the inner shell of the oven upward away from the frame using a flat blade screwdriver
Pull out the old gasket working to the right
Start installing the new gasket as you remove the old one
Re-install the first 3 screws removed
Continue Around the Door Frame
3 Monthly Laboratory Oven Inspection
Safety Precautions
Ensure only qualified maintenance and electrical personnel are performing the inspection.
Turn the main power disconnect switch to the OFF position.
Proceed with the company's Lock-Out / Tag-Out procedure.
Door Inspection
Inspect door gasket(s) for wear such as cracks or tears.
Check that the door seals evenly around its perimeter to negate heat loss.
Adjust door latches if necessary.
6 Monthly Laboratory Oven Inspection
Pre-Inspection Safety Measures
Ensure only qualified maintenance and electrical personnel are performing the inspection.
Turn the main power disconnect switch to the OFF position.
Proceed with company's Lock-Out / Tag-Out procedure.
Motor Shaft Seal Inspection
Check motor shaft seals for deterioration.
Conditioner Blower Wheel Inspection
Inspect the conditioner blower wheel for cleanliness.
Ensure the blower wheel spins freely.
1 Yearly Laboratory Oven Inspection
Safety Precautions
Ensure only qualified personnel perform maintenance
Turn the main power disconnect switch to OFF position
Proceed with company's Lock-Out / Tag-Out procedure
Main Temperature Controller Calibration Inspection
Check temperature indicating accuracy of the main controller
Is the temperature within the acceptable range?
Does the controller activate limit or alarm outputs properly?
Reference the controller user manual for more information
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













