MaintainX Asset Hub logo
EnterprisePricing
Thermal Product Solutions

Thermal Product Solutions Laboratory Oven LO-225-P

Need answers fast?
Explore the manual using AI.

Thermal Product Solutions Laboratory Oven LO-225-P
Thermal Product Solutions Laboratory Oven LO-225-P

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Thermal Product Solutions Laboratory Oven LO-225-P

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Thermal Product Solutions Laboratory Oven LO-225-P

Thermal Product Solutions Laboratory Oven LO-225-P

Create an account to install this asset package.

Maintenance Plans for Thermal Product Solutions Laboratory Oven Model LO-225-P

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Laboratory Oven Inspection

Check mark

Safety Precautions

Check mark

Ensure only qualified maintenance and electrical personnel are performing the inspection.

Check mark

Turn the main power disconnect switch to the OFF position.

Check mark

Proceed with your company's Lock-Out / Tag-Out procedure.

Check mark

Door Inspection

Check mark

Inspect door gasket(s) for wear such as cracks or tears.

Check mark

Check that the door seals evenly around its perimeter to negate heat loss.

Check mark

Adjust door latches if necessary.

Run this procedureArrow right

Laboratory Oven Cleaning

Check mark

Cleaning Instructions

Check mark

Ensure no chloride or fluoride ions are in the cleaning solution

Check mark

Thoroughly wash all surfaces with an appropriate cleaning solution

Check mark

Thoroughly rinse all surfaces

Check mark

Take precaution not to spray beyond the blower outlet when cleaning the conditioning plenum

Run this procedureArrow right

6 Monthly Laboratory Oven Inspection

Check mark

Pre-Inspection Safety Measures

Check mark

Ensure only qualified maintenance and electrical personnel are performing the inspection.

Check mark

Turn the main power disconnect switch to the OFF position.

Check mark

Proceed with the company's Lock-Out / Tag-Out procedure.

Check mark

Motor Shaft Seal Inspection

Check mark

Remove all power from the chamber.

Check mark

Check motor shaft seals for deterioration.

Check mark

Conditioner Blower Wheel Inspection

Check mark

Remove all power from the chamber.

Run this procedureArrow right

Door Gasket Replacement

Check mark

Initial Screw Removal

Check mark

Remove the first screw located behind the gasket at the bottom of the door frame.

Check mark

Remove the next two screws working to the right.

Check mark

Gasket Removal and Installation

Check mark

Use a flat blade screwdriver to pry the inner shell of the oven upward away from the frame.

Check mark

Pull out the old gasket, working to the right.

Check mark

Start installing the new gasket as you remove the old one.

Check mark

Re-install the first 3 screws you removed.

Check mark

Continue Around the Door Frame

Run this procedureArrow right

1 Yearly Laboratory Oven Inspection

Check mark

Safety Precautions

Check mark

Ensure only qualified personnel perform maintenance

Check mark

Turn the main power disconnect switch to OFF

Check mark

Engage Lock-Out / Tag-Out procedure

Check mark

Main Temperature Controller Calibration Inspection

Check mark

Check temperature indicating accuracy

Check mark

Verify proper activation of limit or alarm outputs

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Thermal Product Solutions

Explore Other Assets