Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Sullair Heated Regenerative Dryer DEX-375
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Service
• Repeat all monthly inspections.
• Check the prefilter and afterfilter elements for correct installation and excess dirt.
• Check for tightness of flange bolting especially where high temperatures occur.;
1 Yearly Service
• Replace seats and shaft seals on all butterfly valves.
• Replace seats and shaft seals on all ball valves.; • Dismantle the double-acting pneumatic actuators. Inspect internal components for visual signs of wear and replace parts as necessary.
• Dismantle and inspect solenoid valve internal components for visual signs of wear. Replace parts as necessary.
• Check the function of all temperature controls.;
1 Weekly Check
Once a week, verify the operating sequence at vessel change over with that previously described in Section 5.4 and Section 5.5,
Once a week, verify the adsorption, regeneration heating, cooling and vessel change over times compared to that listed in Section 3.7
Weekly, check the dryer, prefilter and afterfilter for excessive pressure drop.;
1 Monthly Service
• Verify the system is leak free.
• Verify the current draw of the regeneration heater.
• Verify the operation of all pressure gauges, temperature gauges, temperature switches and the dewpoint indicator. ;
1 Daily Check
Daily, verify the regeneration heater outlet temperature is correct and conforms to that listed in Section 3.7.
Daily, verify the prefilter automatic drain is functional.;
Access the parts list for your equipment in MaintainX.
Heater
-
Desiccant Tower
-
K' Type Thermocouple
-
Heater Temperature/Purge Air Temp. Controller
-
Right Tower Depressurization Valve
-
Heater
-
Desiccant Tower
-
K' Type Thermocouple
-
Heater Temperature/Purge Air Temp. Controller
-
Right Tower Depressurization Valve
-
Heater
-
Desiccant Tower
-
K' Type Thermocouple
-
Heater Temperature/Purge Air Temp. Controller
-
Right Tower Depressurization Valve
-
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX