

The Stryker Stretcher 5050 is a high-quality, reliable medical transport solution designed for patient safety and comfort. This stretcher features advanced hydraulic systems and durable construction, making it ideal for emergency medical services and hospital use. Regular maintenance ensures optimal performance and longevity of the Stryker 5050.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Stryker Stretcher 5050
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
5050 Pneumatic Fowler Adjustment
Upload a photo of drawing 5050–33–1 for part reference
Stretcher Chair brakes applied
Push bar removed
Fasteners, nuts and spacers removed and Fowler covers set aside
Set screws removed from center of yokes
Pivot bolts, flat washers and hex nuts removed from gas cylinders
Fowler adjusted as per requirement
Fowler adjustment checked and confirmed
Washers and hex nuts replaced to secure the pivot bolts
5051 Pneumatic Cylinder Replacement
Apply the stretcher brakes
Pump the litter up to full height
Move the Fowler to 70
Remove both the large nuts (A) from the top of the pneumatic cylinder using two 17 mm. wrenches
Remove the nut (B) and bolt (C) from the bottom of the cylinder using a 5/16” hex Allen wrench and an 11/16” open end wrench
Raise the Fowler to 90 and remove the cylinder
Press down on the release pin on the replacement cylinder to fully extend the cylinder
Put the large nut on the new cylinder and screw it down securely
Install the nut (B) and bolt (C) on the bottom of the cylinder using a 5/16” hex Allen wrench and an 11/16” open end wrench
5051 Pneumatic Fowler Adjustment
Apply the stretcher brakes
Pump the stretcher litter up to full height
Move the Fowler to 70 or higher
Loosen the two nuts (A) on the adjustment screw (B) using (2) 3/8” wrenches
Adjustment screw direction
Tighten the two nuts
Repeat for the other side of the Fowler
Raise the Fowler to the full up position
Pull down on both sides of the Fowler, squeeze both release handles and verify both pneumatic cylinders release equally
5051 Pneumatic Fowler Release Handle Adjustment
Stretcher brakes applied
Two Phillips head screws on the handle linkage loosened
Handle tension spring on the patient’s left side released
Adjusted handles to have a 3/4” gap between the outer Fowler frame and the handle
Two screws on the handle linkage bar tightened and spring reattached
It may be necessary to adjust the pneumatic cylinders (see page 25)
Proper Fowler operation verified before returning the stretcher to service
Adjustable Pressure Compensated (P.C.) Valve Replacement
Warning: This procedure requires two people to safely perform.
Apply the Stretcher Chair brakes. Raise the litter to full up. Raise the Fowler and the siderails.
Use a 3/8” wrench to remove the bolts in the litter support tubes above the black bellows on both ends of the litter.
With the assistance of another person, lift the litter off the base and set it aside, taking care not to damage the leg section linkages and other litter components.
Push down on the jack actuator to put the jack in the full down position.
Lift off the plastic base hood, separating the Velcro holding it to the base frame.
Using a 13/16” wrench, remove the adjustable P.C. valve.
Check for any contaminants in the valve as well as the jack base.
Install a new P.C. valve. Moisten the O–ring seal with a little hydraulic fluid to ensure a good seal.
Access the parts list for your equipment in MaintainX.
Acom Nut
17-4
Actuator
5050-370-30
Actuator Arm
5050-1-265
Actuator Cylinder
5050-270-20
Actuator Gasket
390-1-238
Acom Nut
17-4
Actuator
5050-370-30
Actuator Arm
5050-1-265
Actuator Cylinder
5050-270-20
Actuator Gasket
390-1-238
Acom Nut
17-4
Actuator
5050-370-30
Actuator Arm
5050-1-265
Actuator Cylinder
5050-270-20
Actuator Gasket
390-1-238
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













