

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Stelrad Group Boiler CX.340
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Overheat Thermostat Replacement
Safety Precautions
Turn off the gas supply at the inlet gas cock
Switch off and disconnect the electricity supply
Remove existing thermostat
Remove the push-on tags and earth connection on the overheat thermostat body
Undo the two screws retaining the thermostat/piezo igniter bracket to the gas valve
Undo the two screws retaining the thermostat
Remove the retaining clip from the thermostat pocket
Remove the overheat thermostat phial
1 Yearly Overheat Thermostat Lead Option B Replacement
Safety Precautions
Turn OFF the gas supply at the inlet gas cock
Switch OFF and DISCONNECT the electricity supply
Remove Controls Box Front Panel
Remove controls box front panel as described in L.E.D. lights assembly
Store the front panel in a suitable place
Unplug and Remove Wires
Unplug wires from the overheat thermostat
Unplug the lead from printed circuit board No. 2
Manifold Gas Pressure Check
Preparation
Ensure the system is cold and on full load
Set all temperature controls to maximum
Pressure Gauge Setup
Remove the screw in the manifold setting pressure test nipple
Connect a suitable gas pressure gauge securely
Boiler Operation
Light the boiler
Allow the boiler to operate for 15 minutes to stabilize the burners
1 Yearly Pilot Burner Check
Pilot Burner Flame Check
Light the boiler
Verify the pilot flame conditions
Pilot Flame Adjustment
Remove the cover cap from the adjuster screw
Adjust the pilot flame
Replace the cover cap after adjustment
1 Yearly Electrode and Lead Replacement
Safety Precautions
Turn OFF the gas supply at the inlet gas cock
Switch OFF and DISCONNECT the electricity supply
Electrode and Lead Replacement
Remove the centre burner as previously described under Servicing
Unfasten the backnut retaining the electrode to the pilot burner bracket
Fit the new electrode
Re-assemble in reverse order, checking that the spark gap is correct
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













