MaintainX Asset Hub logo
EnterprisePricing
Stelrad Group

Stelrad Group Boiler CX.240

Need answers fast?
Explore the manual using AI.

Stelrad Group Boiler CX.240
Stelrad Group Boiler CX.240

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Stelrad Group Boiler CX.240

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Stelrad Group Boiler CX.240

Stelrad Group Boiler CX.240

Create an account to install this asset package.

Maintenance Plans for Stelrad Group Boiler Model CX.240

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Pilot Burner Check

Check mark

Pilot Burner Flame Check

Check mark

Light the boiler

Check mark

Verify the pilot flame conditions

Check mark

Pilot Flame Adjustment

Check mark

Remove the cover cap

Check mark

Adjust the flame using the adjuster screw

Check mark

Replace the cover cap

Run this procedureArrow right

1 Yearly Overheat Thermostat Lead Option B Replacement

Check mark

Safety Precautions

Check mark

Turn OFF the gas supply at the inlet gas cock

Check mark

Switch OFF and DISCONNECT the electricity supply

Check mark

Remove Controls Box Front Panel

Check mark

Remove controls box front panel as described in L.E.D. lights assembly

Check mark

Store the front panel in a suitable place

Check mark

Thermostat Lead Replacement

Check mark

Unplug wires from overheat thermostat

Check mark

Unplug the lead from printed circuit board No. 2

Run this procedureArrow right

1 Yearly Printed Circuit Board No. 6 Replacement

Check mark

Safety Precautions

Check mark

Turn OFF the gas supply at the inlet gas cock

Check mark

Switch OFF and DISCONNECT the electricity supply

Check mark

Control Box Removal

Check mark

Remove the two screws and washers securing the control box to the side panels

Check mark

Lift the control box off the locating hooks

Check mark

Electrical Connectors Removal

Check mark

Unfasten the two screws securing the plug-in electrical connectors to the rear of the control box

Check mark

Remove the connector

Run this procedureArrow right

Main Burner Check

Check mark

Testing the Main Burner

Check mark

Check that the main burner responds correctly to the manual ON/OFF operations of any controls fitted in the gas control circuit.

Check mark

Flame Failure Safety Device Operation

Check mark

Extinguish the main burner and pilot burner by turning off the main gas inlet cock (Fig. 12) (C).

Check mark

Wait for 1½ minutes.

Check mark

Was the thermocouple operated solenoid valve heard to close during the waiting period?

Run this procedureArrow right

1 Yearly Main Burner Replacement

Check mark

Safety Precautions

Check mark

Turn OFF the gas supply at the inlet gas cock

Check mark

Switch OFF and DISCONNECT the electricity supply

Check mark

Main Burner Removal

Check mark

Remove the burner front plate

Check mark

Remove left and right hand burners

Check mark

Centre Burner Removal

Check mark

Disconnect the pilot pipe and thermocouple connections at the gas valve

Check mark

Pull off the igniter lead at the igniter

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Stelrad Group

Explore Other Assets