Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Stelrad Group Boiler CX.275
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Overheat Thermostat Lead Option B Replacement
Safety Precautions
Turn OFF the gas supply at the inlet gas cock.
Switch OFF and DISCONNECT the electricity supply.
Remove Controls Box Front Panel
Remove controls box front panel as described in L.E.D. lights assembly.
Store the front panel in a suitable place.
Unplug and Remove Wires
Unplug the red and white wires from terminals 1 and 3 on the overheat thermostat.
Remove the earth wire from the bracket fixing screw.
System Testing
General
Check that the system has been filled and properly vented
Ensure all drain cocks are closed and any stop valves in the flow and return mains are open
Purging
Is the electricity supply switched OFF?
Remove the jacket lower front panel
Safety precautions
Is the gas supply turned ON at the meter?
Open the gas supply cock
1 Yearly Boiler Cleaning
Preparation
Lift off the lower front panel from the boiler casing.
Remove the earth connection and the two push-on leads connecting the controls box to the overheat thermostat, if applicable.
Burner Removal
Undo the four nuts securing the burner front plate.
Pull the front plate forwards at the top and lift it out.
Lift out the left and right hand burner after pushing them back to clear the injector.
Remove the thermocouple and pilot gas pipe connections at the gas valve to remove the centre burner.
Pull off the igniter lead at the igniter.
1 Yearly Pilot Burner Replacement
Safety Precautions
Turn OFF the gas supply at the inlet gas cock
Switch OFF and DISCONNECT the electricity supply
Pilot Burner Removal
Remove the centre burner as previously described under Servicing
Unfasten the backnut retaining the electrode and remove
Undo the two screws securing the pilot burner assembly to the pilot burner bracket
Undo the thermocouple and pilot gas pipe connections at the pilot burner assembly
CAREFULLY remove the pilot burner
1 Yearly Printed Circuit Board No. 6 Replacement
Safety Precautions
Turn OFF the gas supply at the inlet gas cock
Switch OFF and DISCONNECT the electricity supply
Control Box Removal
Remove the two screws and washers securing the control box to the side panels
Lift the control box off the locating hooks
Electrical Connectors Removal
Unfasten the two screws securing the plug-in electrical connectors to the rear of the control box
Remove the connector
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX