MaintainX Asset Hub logo
EnterprisePricing
Amada

Amada Press Brake RG-35S

Need answers fast?
Explore the manual using AI.

Amada Press Brake RG-35S
Amada Press Brake RG-35S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Amada Press Brake RG-35S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Amada Press Brake RG-35S

Amada Press Brake RG-35S

Create an account to install this asset package.

Maintenance Plans for Amada Press Brake Model RG-35S

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 3 Months Press Brake Hydraulic Oil Change

Check mark

Preparation

Check mark

Ensure recommended hydraulic oil is available

Check mark

Open the ram to the maximum opening limit

Check mark

Press the HYD. OFF button

Check mark

Turn the POWER ON/OFF keyswitch to OFF

Check mark

Tank Access and Oil Drainage

Check mark

Remove all bolts fixing the two top covers of the tank

Check mark

Remove the top covers

Check mark

Drain the old hydraulic oil from the tank into an empty can using a pump

Run this procedureArrow right

Press Brake Hydraulic Oil Level Check

Check mark

Preparation

Check mark

Open the ram to the maximum opening limit

Check mark

Turn the POWER ON/OFF keyswitch to OFF

Check mark

Hydraulic Oil Level Inspection

Check mark

Check the hydraulic oil level on the oil gauge

Check mark

Is the hydraulic oil filled to the middle mark of the oil gauge?

Check mark

Refill Hydraulic Oil

Check mark

Is the hydraulic oil level low?

Check mark

Remove the top cover or covers of the hydraulic oil tank

Run this procedureArrow right

2000 Hourly / 1 Yearly Press Brake Hydraulic Oil Change

Check mark

Verify recommended hydraulic oil is available

Check mark

Preparation

Check mark

Open the ram to the maximum opening limit

Check mark

Press the HYD. OFF button

Check mark

Ensure the HYD. ON button is extinguished

Check mark

Turn the POWER ON/OFF keyswitch to OFF

Check mark

Tank Access and Oil Drainage

Check mark

Remove all bolts fixing the two top covers of the tank and remove the top covers

Check mark

Drain the old hydraulic oil from the tank into an empty can using a pump

Run this procedureArrow right

Press Brake Hydraulic System Maintenance

Check mark

Hydraulic Oil Inspection and Change

Check mark

Is the hydraulic oil badly contaminated?

Check mark

Change the hydraulic oil if it is contaminated

Check mark

Hydraulic Circuit Inspection

Check mark

Check for signs of contamination in the hydraulic circuit

Check mark

Is there abnormal noise from the hydraulic pump?

Check mark

Is there a decrease in discharge capacity?

Check mark

Is there a decrease in bending speed or vibration in the ram?

Check mark

Filter Maintenance

Run this procedureArrow right

Press Brake Ram Check

Check mark

Remove the tools from the machine

Check mark

Fully press the bar pedal

Check mark

Check that the ram closes to the multiple opening limit and stops

Check mark

Turn the multiple opening limit setting handwheel fully counterclockwise

Check mark

Fully press the bar pedal with punches and dies installed

Check mark

Turn the multiple opening limit setting handwheel clockwise to close the ram to the desired position

Check mark

Release the bar pedal

Check mark

Check that the ram opens to the maximum opening limit

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Amada

Explore Other Assets