MaintainX Asset Hub logo
EnterprisePricing
Siemens

Siemens Low Voltage Power Circuit Breaker WLS2A316

Need answers fast?
Explore the manual using AI.

Siemens Low Voltage Power Circuit Breaker WLS2A316
Siemens Low Voltage Power Circuit Breaker WLS2A316

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Siemens Low Voltage Power Circuit Breaker WLS2A316

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Siemens Low Voltage Power Circuit Breaker WLS2A316

Siemens Low Voltage Power Circuit Breaker WLS2A316

Create an account to install this asset package.

Maintenance Plans for Siemens Low Voltage Power Circuit Breaker Model WLS2A316

Integrate maintenance plans directly into your work orders in MaintainX.

Mechanical Function Test

Check mark

Charge the closing spring manually

Check mark

Close

Check mark

Open

Check mark

Check again the wear indicator

Run this procedureArrow right

1 Yearly Function Check

Check mark

Close the cubicle doors

Check mark

Charge closing spring of circuit breakers to be interlocked (page 6-4)

Check mark

Test the various possibilities of the planned interlocking configuration one after the other

Check mark

Re-adjust Bowden cables if necessary

Check mark

Discharge the closing spring of the circuit breakers to be interlocked (page 23-2)

Check mark

Note: The following maintenance points must be followed:

Check mark

1 The adjustment of the Bowden cables needs to be checked after the first 100 switching operations and must be readjusted if necessary.

Check mark

2 The adjustment of the interlocking device needs to be checked and, if necessary, readjusted every 1000 operations or at least once every year.

Check mark

3 During the inspection, the Bowden cables have to be checked against kinks and abrasions, split wires of the exposed steel cable, damage to the cable housing and the adjustment unit (tube setting with thread and nut) and have to be readjusted if necessary. In addition, the movability of movable parts of the interlocking device in their bearings needs to be examined.

Run this procedureArrow right

1 Yearly Circuit Breaker Maintenance

Check mark

DANGER: Hazardous voltage. Will cause death, serious personal injury, or equipment/property damage. Turn off and lock out all power supplying this device before working on this device.

Check mark

Only qualified personnel should work on this equipment, after becoming thoroughly familiar with all warnings, safety notices, and maintenance procedures contained herein and on the devices.

Check mark

WARNING: High speed moving parts. Can cause serious personal injury. Discharge the closing spring before inspection and before carrying out any work on the circuit breaker.

Check mark

Is the worker trained and authorized to energize, de-energize, clear, ground and label circuits and equipment in accordance with established safety practices?

Check mark

Is the worker trained in the proper care and use of protective equipment in accordance with established safety practices?

Check mark

Is the worker trained in administering first aid?

Check mark

Is the circuit breaker in good condition?

Check mark

Number of operations performed on the circuit breaker

Check mark

Has the circuit breaker been inspected after breaking heavy current?

Run this procedureArrow right

Racking Shaft Removal

Check mark

Strip off the driving collar of the spring dump mechanism when extracting the racking shaft (page 23-21).

Check mark

Retaining ring removed

Check mark

Crank removed

Check mark

Racking shaft pulled out on the other side

Check mark

Sign off on the racking shaft removal

Run this procedureArrow right

Current Sensor Removal

Check mark

Lay circuit breaker on its side

Check mark

Remove cover of cable duct

Check mark

Detach connectors

Check mark

Remove current sensor covers

Check mark

Remove current sensors

Check mark

Sign off on the current sensor removal

Run this procedureArrow right

Parts for Siemens Low Voltage Power Circuit Breaker WLS2A316

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Circuit Breakers Secondary Disconnect Block

WLCNMD

Secondary Disconnect Extension

WLCNMDA

Screw Clamp Terminal (Sigut) System

WLGAUXPLUGP

Spring Clamp Terminal

WLGAUXPLUGT

Ring Terminal System

WLGAUXPLUGR

Circuit Breakers Secondary Disconnect Block

WLCNMD

Secondary Disconnect Extension

WLCNMDA

Screw Clamp Terminal (Sigut) System

WLGAUXPLUGP

Spring Clamp Terminal

WLGAUXPLUGT

Ring Terminal System

WLGAUXPLUGR

Circuit Breakers Secondary Disconnect Block

WLCNMD

Secondary Disconnect Extension

WLCNMDA

Screw Clamp Terminal (Sigut) System

WLGAUXPLUGP

Spring Clamp Terminal

WLGAUXPLUGT

Ring Terminal System

WLGAUXPLUGR

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Siemens

Explore Other Assets