

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Sandpiper Diaphragm Pump S30B1X2AAAS000.
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Air Distribution Valve Maintenance
Pre-maintenance safety checks
Shut off the compressed air line
Bleed the pressure
Disconnect the air line from the pump
Remove Hex Head Cap Screws (1-F)
Remove end cap (1-E)
Remove spool part of sleeve and spool set (1-B)
Press sleeve (1-B) from body (1-A)
Inspect O-Ring (1-D)
Routine Air Line Lubricator Check
Ensure Lubricator Installation
Is an air line lubricator installed?
Lubricator Setting Verification
Enter the current lubricator setting (drops per SCFM)
Enter the air consumption of the pump (SCFM)
Is the lubricator set to deliver one drop of SAE 10 non-detergent oil for every 20 SCFM?
Performance Check
Consult the Performance Curve to verify air consumption
Is the pump operating without sluggishness or stalling?
Initial Pump Startup Check
Pre-Operation Inspection
Inspect all fasteners for loosening caused by gasket creep
Retighten any loose fasteners to prevent leakage, following the recommended torques stated in the manual
Pump Location and Suction Line Setup
Locate the pump as close to the product being pumped as possible
Keep the suction line length and number of fittings to a minimum
Ensure the suction line diameter is not reduced
Air Supply Connection
Connect the pump air inlet to an air supply with sufficient capacity and pressure
Pilot Valve Maintenance
Pre-maintenance Safety Measures
Shut off the compressed air line
Bleed the pressure
Disconnect the air line from the pump
Pilot Valve Disassembly and Inspection
Remove snap ring (4-F)
Remove sleeve (4-B)
Inspect O-Rings (4-C) and replace if required
Remove spool (4-D) from sleeve (4-B)
Muffler Screen Cleaning
Initial Inspection
Is the pump operating erratically or has it stopped?
Inspect the air exhaust muffler for blockage or icing
Muffler Screen Maintenance
Remove the muffler screen
Clean or de-ice the muffler screen as required
Re-install the muffler screen
Air Supply Check
Is there water in the compressed air supply?
Access the parts list for your equipment in MaintainX.
Air End Kit - Aluminum Center (Air Valve Assembly, Pilot Valve Assembly, Seals, O-Rings, Gaskets, Plungers)
476-421-000
Wet End Kit - Santoprene Diaphragms, PTFE Overlays, PTFE Balls, PTFE Seats
476-171-654
Hardware Kit - Zinc Plated Capscrews, Washers and Hex Nuts
475-197-330
Air Valve Assembly - Aluminum Center
031.173.000
Body, Air Valve - Aluminum
095.109.157
Air End Kit - Aluminum Center (Air Valve Assembly, Pilot Valve Assembly, Seals, O-Rings, Gaskets, Plungers)
476-421-000
Wet End Kit - Santoprene Diaphragms, PTFE Overlays, PTFE Balls, PTFE Seats
476-171-654
Hardware Kit - Zinc Plated Capscrews, Washers and Hex Nuts
475-197-330
Air Valve Assembly - Aluminum Center
031.173.000
Body, Air Valve - Aluminum
095.109.157
Air End Kit - Aluminum Center (Air Valve Assembly, Pilot Valve Assembly, Seals, O-Rings, Gaskets, Plungers)
476-421-000
Wet End Kit - Santoprene Diaphragms, PTFE Overlays, PTFE Balls, PTFE Seats
476-171-654
Hardware Kit - Zinc Plated Capscrews, Washers and Hex Nuts
475-197-330
Air Valve Assembly - Aluminum Center
031.173.000
Body, Air Valve - Aluminum
095.109.157
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













