Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

National Oilwell Varco Sanitary Pump FA2A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Packing Adjustment
Initial Startup Adjustment
Adjust gland nuts for a leakage rate of 1 to 2 drops per second
Has the packing seated and adjusted to the operating temperature after 10 to 15 minutes?
Post Startup Adjustment
Is there excessive leakage from the stuffing box after 15 minutes of operation?
Tighten the gland nuts until a desired leakage rate is obtained
Caution
Ensure gland nuts are not tightened to zero leakage
Consultation
Pump Lubrication
Assembly Preparation
Check all components for wear and tear
Replace all worn parts
Lubrication During Assembly
Pack the bearings with lubricant before assembly
Ensure lubricant completely covers the faces of the bearing races
Lubricate the packing rings during assembly
Add additional grease through the zerk fitting after assembly
Approved Lubricants
Rotor Inspection
Rotor Measurement
Measure the rotor crest-to-crest diameter
Enter the standard crest-to-crest diameter value for comparison
Rotor Condition Assessment
Is the measured diameter within 0.010” (.25mm) of the standard value and free of deep nicks, gouges, or other surface defects?
Is the crest-to-crest diameter between 0.011” (.28mm) and 0.050” (1.3mm) under the standard value?
Rotor Renewal Criteria
Check the following conditions for rotor renewal by chrome plating
Replating Process
Packing Replacement
Packing Removal
Remove the gland nuts and packing gland from the stuffing box.
Use packing extractors to remove the first two packing rings, the lantern rings, and the last two packing rings.
Inspection and Preparation
Inspect the drive shaft for excessive wear or grooves.
Is the drive shaft worn or grooved?
Lubricate the 4 new packing rings with packing grease if the drive shaft is not worn.
Packing Installation
Insert two rings of packing onto the shaft.
8000 Hourly Bearing Inspection
Routine Adjustment and Lubrication
Adjust the packing as necessary
Lubricate the packing
Bearing Temperature Familiarization
Touch the bearing housing to check normal operating temperature
Temperature Rise Check
Is there a sudden, rapid rise in operating temperature?
If temperature rise is detected
Remove the drive shaft and shaft bearings from the bearing housing
Access the parts list for your equipment in MaintainX.
Bearing Housing
4250184001
Close-Coupled Adapter, 140 mm Flange
4250417001
Close-Coupled Adapter, 160 mm Flange
4250417002
Bearing Housing Retaining Ring
4220425001
Bearing Cover Bolt
4220210040
Bearing Housing
4250184001
Close-Coupled Adapter, 140 mm Flange
4250417001
Close-Coupled Adapter, 160 mm Flange
4250417002
Bearing Housing Retaining Ring
4220425001
Bearing Cover Bolt
4220210040
Bearing Housing
4250184001
Close-Coupled Adapter, 140 mm Flange
4250417001
Close-Coupled Adapter, 160 mm Flange
4250417002
Bearing Housing Retaining Ring
4220425001
Bearing Cover Bolt
4220210040
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX