

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Robopac Self Propelled Wrapping Robot S6
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Standard Feeler Thrust Adjustment
Initial Setup
Lower the rudder
Lift the hood
Lever and Tightener Adjustment
Grip the lever
Connect the lever to the tightener
Adjust the tightener following its path
Disconnect the lever from the tightener
Put back the lever
Lightened Steering Wheel Feeler Thrust Adjustment
Crank Operation
Open the crank
Adjust the thrust of the feeler
Close the crank
Record the index value for thrust indication
Notes on the adjustment process
200 Hourly Reel Carriage Lifting Chain Adjustment
Pre-Operation Safety Checks
Ensure understanding of the 'Instructions for use'
Review SAFETY WARNINGS and assess RESIDUAL RISKS
Enable all safety devices and wear provided DPI
Mark the intervention area and prevent unauthorized access
Chain Adjustment Procedure
Lift the spool carriage to 'top' end stroke with machine in 'manual mode'
Switch the machine off
Remove the guard
Brake Adjustment
Preparation
Lift the machine and rest it on a support
Ensure the machine is resting correctly to prevent the risk of crushing during the operation
Remove the guard
Loosen the locking nuts
Adjustment
Insert a 0.25 mm spacer near the screw using a thickness gauge
Adjust the distance between the magnet and the flange using the screw until slight resistance is felt on the thickness gauge
Repeat the adjustment near the other screws
1 Monthly Battery Maintenance
WARNING! Do not refill with water in GIV-Batteries!
Measure and record the voltages of all cells or bloc batteries with the charger switched on
Measure and record the specific gravity of the electrolyte in all cells after charging has ended
Measure and record the temperature of the electrolyte in all cells after charging has ended
Request further testing and maintenance by the service department if significant changes or differences are found
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













