MaintainX Asset Hub logo
EnterprisePricing
Robopac

Robopac Self-Propelled Stretch Wrapper Machine Robot S7

Need answers fast?
Explore the manual using AI.

Robopac Self-Propelled Stretch Wrapper Machine Robot S7
Robopac Self-Propelled Stretch Wrapper Machine Robot S7

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Robopac Self-Propelled Stretch Wrapper Machine Robot S7

Robopac Self-Propelled Stretch Wrapper Machine Robot S7

Create an account to install this asset package.

Maintenance Plans for Robopac Self-Propelled Stretch Wrapper Machine Model Robot S7

Integrate maintenance plans directly into your work orders in MaintainX.

10000 Hourly Steering Return Spring Replacement

Check mark

Warning: This maintenance requires trained personnel with PPE!

Check mark

Enter the machine's hour meter reading

Check mark

Steering return spring in good condition?

Check mark

If the spring is not in good condition, proceed with replacement

Check mark

Upload a photo of the replaced spring

Check mark

Sign off on the spring replacement

Run this procedureArrow right

200 Hourly Self-Propelled Stretch Wrapper Machine Maintenance

Check mark

Clean Rubber rollers

Check mark

Lubricate Film carriage

Check mark

See 'Lubrication point diagram'

Check mark

Spread grease over it

Check mark

Check the lubricant level

Check mark

Do not top up and/or change in life-lubed reduction units and gearmotors

Check mark

Important: Observe the lubrication frequency to obtain the best performance and a longer machine’s operating life. Use lubricants (oils and greases) recommended by the Manufacturer or with similar chemical-physical features.

Check mark

Check the chain tensioning Film carriage

Check mark

See 'Film carriage lifting chain adjustment'

Run this procedureArrow right

40 Hourly Machine Working Area Cleaning

Check mark

Warning: This cleaning procedure requires trained personnel with PPE!

Check mark

Cycle timings have been defined on the basis of the standard cycle.

Check mark

The standard cycle is the following: 500 mm high film reel, 1500 mm high pallet, pallet weight equal to 1500 kg, total wrapping cycle consisting of two turns at the base, two turns at the top with rotation speed of 12 r.p.m. or 80 m/1’ and carriage upstroke and downstroke speed equal to 4 m/1’.

Check mark

Machine Working Areas cleaned?

Check mark

Upload a photo of the cleaned machine working area

Check mark

Sign off on the machine working area cleaning

Run this procedureArrow right

5000 Hourly Reduction Unit / Gearmotor Change

Check mark

Warning: Follow the scheduled maintenance intervals for best performance, long operating life and safety.

Check mark

Change the lubricant in reduction units and gearmotors.

Check mark

Check the lubricant level.

Check mark

Do not top up and/or change in life-lubed reduction units and gearmotors.

Check mark

Important: Observe the lubrication frequency for best performance and longer machine’s operating life. Use recommended lubricants.

Check mark

Cycle timings are based on the standard cycle: 500 mm high film reel, 1500 mm high pallet, pallet weight equal to 1500 kg, total wrapping cycle consisting of two turns at the base, two turns at the top with rotation speed of 12 r.p.m. or 80 m/1’ and carriage upstroke and downstroke speed equal to 4 m/1’.

Check mark

Sign off on the 5000 Hourly Reduction Unit / Gearmotor Change

Run this procedureArrow right

Battery Replacement

Check mark

Caution - warning: The main fuse of the machine is built into the battery cables, use only original cables.

Check mark

Lift the battery casing (A)

Check mark

Remove the connector (B) from the plug

Check mark

Caution - warning: First disconnect the negative terminal (−)

Check mark

Disconnect the terminals (C-D-E-F)

Check mark

Extract the batteries (G) and replace them

Check mark

Caution - warning: Respect the polarities when connecting the terminals. Grease the positive terminal (✚) and connect it first.

Check mark

Reconnect the terminals (C-D-E-F)

Check mark

Engage the connector (B) to the plug

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

Explore Other Assets