MaintainX Asset Hub logo
EnterprisePricing
Nordson

Nordson Bulk Melter AltaPail II

Need answers fast?
Explore the manual using AI.

Nordson Bulk Melter AltaPail II
Nordson Bulk Melter AltaPail II

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Nordson Bulk Melter AltaPail II

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Nordson Bulk Melter AltaPail II

Nordson Bulk Melter AltaPail II

Create an account to install this asset package.

Maintenance Plans for Nordson Bulk Melter Model AltaPail II

Integrate maintenance plans directly into your work orders in MaintainX.

Control Panel Replacement

Check mark

WARNING: Risk of electrical shock. Failure to observe may result in personal injury, death, or equipment damage.

Check mark

Enter the Service kit P/N purchased

Check mark

Check the tools you have

Check mark

WARNING: Disconnect the bulk melter from the line voltage.

Check mark

Main switch set to 0/OFF and electrical cabinet door opened

Check mark

Bus cable unplugged from old control panel

Check mark

M4 hexagon nuts and tooth lock washers removed

Check mark

Old control panel and old seal pressed forwards and out of the electrical cabinet door

Check mark

New control panel inserted and secured using the tooth lock washers

Run this procedureArrow right

15000 Hourly / 2 Yearly Motor and Gear Box Lubricant Change

Check mark

Warning: Only trained personnel should perform this procedure

Check mark

Drain lubricant when warm

Check mark

Use only the stated lubricant or one that has proven to be equivalent

Check mark

Using any other lubricant can result in premature wear and/or damage to the gear box

Check mark

Properly dispose of the old lubricant according to local regulations

Check mark

Remove gear box from the motor to change lubricant

Check mark

Wash out casing with suitable cleaning agent and remove lubricant residue

Check mark

Lubricant Changing Interval: Every 15000 hours of operation or at least every 2 to 3 years

Check mark

Capacity: The lubricant quantity is indicated on the ID plate

Run this procedureArrow right

Initial Melter Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Re-tighten the following components with a torque wrench while the material is still soft (approx. 70 ° C/158 ° F, depending on the material)

Check mark

Plug, A

Check mark

Hose Fitting, A

Check mark

Re-tighten the following components with a torque wrench crosswise

Check mark

Pump: Fixing screws, A, B

Check mark

Safety valve, A

Check mark

Sign off on the melter maintenance

Run this procedureArrow right

1 Daily Fan And Air Filter Maintenance

Check mark

Depending on dust accumulation, the air filters in the fan and for the air outlet must be cleaned (knocked out) or replaced.

Check mark

Refer to separate document Parts for filter order numbers.

Check mark

Is dust accumulation severe?

Check mark

Daily Maintenance Tasks

Check mark

Sign off on the daily fan and air filter maintenance

Run this procedureArrow right

Melter Check

Check mark

- Melting plate:

Check mark

Check melting plate for charred material, clean if necessary

Check mark

- Base plate:

Check mark

Check base plate for material residue or other impurities, clean if necessary;

Run this procedureArrow right

Parts for Nordson Bulk Melter AltaPail II

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Warning Label

290083

Warning Label

290082

Warning Label

421460

Tags, Sheet Of, Versa/Durablue LG, CE LANG

1059866

Tag,Unit Stamping, Altapail II

10000291

Warning Label

290083

Warning Label

290082

Warning Label

421460

Tags, Sheet Of, Versa/Durablue LG, CE LANG

1059866

Tag,Unit Stamping, Altapail II

10000291

Warning Label

290083

Warning Label

290082

Warning Label

421460

Tags, Sheet Of, Versa/Durablue LG, CE LANG

1059866

Tag,Unit Stamping, Altapail II

10000291

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Nordson

Explore Other Assets