MaintainX Asset Hub logo
EnterprisePricing
Miura

Miura Steam Boiler LXL-200

Need answers fast?
Explore the manual using AI.

Miura Steam Boiler LXL-200
Miura Steam Boiler LXL-200

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Miura Steam Boiler LXL-200

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Miura Steam Boiler LXL-200

Miura Steam Boiler LXL-200

Create an account to install this asset package.

Maintenance Plans for Miura Steam Boiler Model LXL-200

Integrate maintenance plans directly into your work orders in MaintainX.

4 Monthly Feed-water Tank Interior Cleaning

Check mark

Warning: No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.

Check mark

Warning: Water in supply lines for boilers connecting to a deaerator or hot water tank is extremely hot. For this reason, you should wait until the tank water has sufficiently cooled down (at least two hours after boiler shutdown) before performing this work. Failure to observe this precaution can result in burns and other injuries.

Check mark

Turn off the breaker for the boiler’s main power. Confirm that the steam pressure gauge is reading 0 PSI. If this is not the case, stand by until the pressure reading drops to zero.

Check mark

Warning: Never operate the breaker for the boiler’s main power supply with wet hands. Failure to observe this precaution may lead to electric shock and have other undesirable consequences.

Check mark

Close the main makeup valve.

Check mark

Open the blowdown valve for the feed water tank.

Check mark

When the discharge of water ends, close the feed water tank’s blowdown valve.

Check mark

Open the main makeup valve.

Check mark

Sign off on the feed-water tank interior cleaning

Run this procedureArrow right

4 Monthly Feed-water Strainer Cleaning

Check mark

Warning: No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.

Check mark

Warning: Water in the feed-water tank for the boiler connecting to a deaerator or hot water tank is extremely hot. Wait until the boiler’s water supply lines have sufficiently cooled down (at least two hours after boiler shutdown) before performing this work. Failure to observe this precaution can result in burns and other injuries.

Check mark

Turn off the breaker for the boiler’s main power. Confirm that the steam pressure gauge is reading 0 PSI.

Check mark

Warning: Never operate the breaker for the boiler’s main power supply with wet hands. Failure to observe this precaution may lead to electric shock and have other undesirable consequences.

Check mark

Confirm that the main feed water valve is closed.

Check mark

Open the boiler blowdown valve and carry out boiler-water blowdown.

Check mark

Warning: Be sure to always carry out boiler-water blowdown before cleaning the feed water strainer. If reverse flow of boiler water were to occur during this procedure, it could result in burns or other injury.

Check mark

When the discharge of boiler water has stopped, close the boiler blowdown valve.

Check mark

Open the feed water pump’s air bleed valve. This action releases pressure from the feed water piping.

Run this procedureArrow right

1 Daily Gas Pressure Check

Check mark

Warning: No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.

Check mark

Open the main gas valve

Check mark

Using the boiler’s gas pressure gauge, confirm whether the gas is pressurized to the required range (i.e., 3 to 5 PSI)

Check mark

If the reading on the gas pressure gauge is not within the required range, immediately shutdown the boiler

Check mark

If the reading on the gas pressure gauge is not within the required range, contact a MIURA sales office or your local dealer for further instruction.

Check mark

Sign off on the daily gas pressure check

Run this procedureArrow right

4 Monthly Safety Sensors Check

Check mark

Warning: No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.

Check mark

Warning: As all parts of the boiler remain at a high temperature for some time after shutdown, you should allow sufficient time for cooling down before performing this work. Failure to observe this precaution can result in burns and other injury.

Check mark

Before attempting to clean the UV sensor’s protective glass, be sure to always receive instruction from MIURA maintenance personnel and to fully familiarize yourself with the process involved.

Check mark

Turn off the breaker for the boiler’s main power.

Check mark

Warning: Never operate the breaker for the boiler’s main power supply with wet hands. Failure to observe this precaution may lead to electric shock and have other undesirable consequences.

Check mark

Extract the UV sensor.

Check mark

Remove the mounting screws from the phototube base.

Check mark

Using a soft cloth, wipe all soot from the glass at the bottom of the UV sensor’s base.

Check mark

Reassemble and replace the sensor in its original condition and position.

Run this procedureArrow right

1 Yearly UV Sensor Protective Glass Cleaning

Check mark

Warning: No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.

Check mark

Warning: As all parts of the boiler remain at a high temperature for some time after shutdown, you should allow sufficient time for cooling down before performing this work. Failure to observe this precaution can result in burns and other injury.

Check mark

Before attempting to clean the UV sensor’s protective glass, be sure to always receive instruction from MIURA maintenance personnel and to fully familiarize yourself with the process involved.

Check mark

Turn off the breaker for the boiler’s main power.

Check mark

Warning: Never operate the breaker for the boiler’s main power supply with wet hands. Failure to observe this precaution may lead to electric shock and have other undesirable consequences.

Check mark

Extract the UV sensor.

Check mark

Remove the mounting screws from the phototube base.

Check mark

Using a soft cloth, wipe all soot from the glass at the bottom of the UV sensor’s base.

Check mark

Reassemble and replace the sensor in its original condition and position.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Miura

Explore Other Assets