Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Miura Steam Boiler LX-200
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Steam Boiler Blowdown
Warning!
No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.
Warning!
Do not start blowdown until you have first confirmed that the boiler has been shutdown. Failure to observe this precaution can result in burns and other injuries.
There is no need to carry out blowdown immediately after the display presents a blowdown request during normal boiler operation. It is recommended to wait until the next startup on the following operating day.
The system will inform you that regular blowdown is required by lighting the Status lamp in yellow and outputting the message “BOILER CHECK1” on the display. (The display’s “B” indicator will also flash at this time.)
Although the Status lamp will turn off and the display’s blowdown request will be cleared when the “DATA” button is pressed, the “B” indicator will not.
Blowdown must always be carried out in strict accordance with instructions given by MIURA maintenance personnel.
Blowdown Procedure
1 Daily Chemical Feed Check
Warning: No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.
Checking the Chemical Feeder
Confirm that the chemical feed is as required.
Confirm that sufficient liquid is present to properly dissolve chemicals.
Confirm that there is no air in the chemical feed pump or feed line.
Warning: Protective glasses and rubber gloves must be worn when adding chemical compounds. These compounds may cause sight loss, burns, and other injuries when they contact with skin or eyes.
If boiler chemical comes into direct contact with skin, immediately wash away using cold water.
If this chemical enters an eye, immediately wash away with cold water and seek medical attention.
Always follow the instructions of your water treatment personnel in terms of chemical dosage.
1 Daily Steam Boiler Maintenance
Warning!
No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.
To keep your MIURA boilers running in optimum condition, be sure to check the following daily:
a) CHEMICAL FEED PUMP
i. Proper chemical feed.
ii. No air in the chemical feed pump or lines.
b) WATER SOFTENER
i. Boiler Make-up water is completely soft (use a test kit sensitive to less than 1.0 PPM).
ii. Make sure the water softener timer or softener flow meter is working every day.
1 Daily Steam Pressure Check
Warning: No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.
Startup the boiler as described in Section 8.1: Boiler Startup.
Confirm that the reading on the steam pressure gauge is in the normal range, and that the gauge pointer is not swinging wildly.
Warning: If the steam pressure is not within the normal range, immediately shutdown the boiler and contact a MIURA sales office or your local dealer for further instruction. Continued use of the boiler with abnormal steam pressure levels may result in boiler damage, which in turn could lead to injury.
Sign off on the daily steam pressure check
4 Monthly Feed-water Tank Interior Cleaning
Warning: No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.
Warning: Water in supply lines for boilers connecting to a deaerator or hot water tank is extremely hot. For this reason, you should wait until the tank water has sufficiently cooled down (at least two hours after boiler shutdown) before performing this work. Failure to observe this precaution can result in burns and other injuries.
Turn off the breaker for the boiler’s main power. Confirm that the steam pressure gauge is reading 0 PSI. If this is not the case, stand by until the pressure reading drops to zero.
Warning: Never operate the breaker for the boiler’s main power supply with wet hands. Failure to observe this precaution may lead to electric shock and have other undesirable consequences.
Close the main makeup valve.
Open the blowdown valve for the feed water tank.
When the discharge of water ends, close the feed water tank’s blowdown valve.
Open the main makeup valve.
Sign off on the feed-water tank interior cleaning
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX