PDF MANUAL

Manual for Miura Steam Boiler LX-200

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Miura Steam Boiler LX-200

Miura Steam Boiler LX-200

Create an account to install this asset package.

Maintenance Plans for Miura Steam Boiler Model LX-200

Integrate maintenance plans directly into your work orders in MaintainX.

Steam Boiler Blowdown

Check mark

Warning!

Check mark

No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.

Check mark

Warning!

Check mark

Do not start blowdown until you have first confirmed that the boiler has been shutdown. Failure to observe this precaution can result in burns and other injuries.

Check mark

There is no need to carry out blowdown immediately after the display presents a blowdown request during normal boiler operation. It is recommended to wait until the next startup on the following operating day.

Check mark

The system will inform you that regular blowdown is required by lighting the Status lamp in yellow and outputting the message “BOILER CHECK1” on the display. (The display’s “B” indicator will also flash at this time.)

Check mark

Although the Status lamp will turn off and the display’s blowdown request will be cleared when the “DATA” button is pressed, the “B” indicator will not.

Check mark

Blowdown must always be carried out in strict accordance with instructions given by MIURA maintenance personnel.

Check mark

Blowdown Procedure

Run this procedureArrow right

1 Daily Chemical Feed Check

Check mark

Warning: No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.

Check mark

Checking the Chemical Feeder

Check mark

Confirm that the chemical feed is as required.

Check mark

Confirm that sufficient liquid is present to properly dissolve chemicals.

Check mark

Confirm that there is no air in the chemical feed pump or feed line.

Check mark

Warning: Protective glasses and rubber gloves must be worn when adding chemical compounds. These compounds may cause sight loss, burns, and other injuries when they contact with skin or eyes.

Check mark

If boiler chemical comes into direct contact with skin, immediately wash away using cold water.

Check mark

If this chemical enters an eye, immediately wash away with cold water and seek medical attention.

Check mark

Always follow the instructions of your water treatment personnel in terms of chemical dosage.

Run this procedureArrow right

1 Daily Steam Boiler Maintenance

Check mark

Warning!

Check mark

No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.

Check mark

To keep your MIURA boilers running in optimum condition, be sure to check the following daily:

Check mark

a) CHEMICAL FEED PUMP

Check mark

i. Proper chemical feed.

Check mark

ii. No air in the chemical feed pump or lines.

Check mark

b) WATER SOFTENER

Check mark

i. Boiler Make-up water is completely soft (use a test kit sensitive to less than 1.0 PPM).

Check mark

ii. Make sure the water softener timer or softener flow meter is working every day.

Run this procedureArrow right

1 Daily Steam Pressure Check

Check mark

Warning: No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.

Check mark

Startup the boiler as described in Section 8.1: Boiler Startup.

Check mark

Confirm that the reading on the steam pressure gauge is in the normal range, and that the gauge pointer is not swinging wildly.

Check mark

Warning: If the steam pressure is not within the normal range, immediately shutdown the boiler and contact a MIURA sales office or your local dealer for further instruction. Continued use of the boiler with abnormal steam pressure levels may result in boiler damage, which in turn could lead to injury.

Check mark

Sign off on the daily steam pressure check

Run this procedureArrow right

4 Monthly Feed-water Tank Interior Cleaning

Check mark

Warning: No work other than that clearly indicated below is to be carried out on the boiler. Failure to observe this precaution may result in injury.

Check mark

Warning: Water in supply lines for boilers connecting to a deaerator or hot water tank is extremely hot. For this reason, you should wait until the tank water has sufficiently cooled down (at least two hours after boiler shutdown) before performing this work. Failure to observe this precaution can result in burns and other injuries.

Check mark

Turn off the breaker for the boiler’s main power. Confirm that the steam pressure gauge is reading 0 PSI. If this is not the case, stand by until the pressure reading drops to zero.

Check mark

Warning: Never operate the breaker for the boiler’s main power supply with wet hands. Failure to observe this precaution may lead to electric shock and have other undesirable consequences.

Check mark

Close the main makeup valve.

Check mark

Open the blowdown valve for the feed water tank.

Check mark

When the discharge of water ends, close the feed water tank’s blowdown valve.

Check mark

Open the main makeup valve.

Check mark

Sign off on the feed-water tank interior cleaning

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Miura

Explore Other Assets