Manual for Mitsubishi Split System MUZ-GS36NA

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mitsubishi Split System MUZ-GS36NA

Mitsubishi Split System MUZ-GS36NA

Create an account to install this asset package.

Maintenance Plans for Mitsubishi Split System Model MUZ-GS36NA

Integrate maintenance plans directly into your work orders in MaintainX.

Compressor Fixed-Frequency Check

Check mark

Start COOL mode by pressing the emergency operation switch once

Check mark

Start HEAT mode by pressing the emergency operation switch twice

Check mark

Verify the test run operation continues for 30 minutes

Check mark

Check compressor operation frequency

Check mark

Ensure indoor fan operates at High speed

Check mark

Confirm test run operation finishes after 30 minutes and EMERGENCY OPERATION starts

Check mark

Cancel test run operation by pressing the emergency operation switch or any button on remote controller

Run this procedureArrow right

Compressor Replacement

Check mark

Preparation

Check mark

Remove the cabinet and panels

Check mark

Remove the inverter assembly

Check mark

Reactor Removal

Check mark

Remove the screws fixing the reactor

Check mark

Remove the reactor

Check mark

Soundproofing and Gas Recovery

Check mark

Remove the soundproof felt

Check mark

Recover gas from the refrigerant circuit

Run this procedureArrow right

Outdoor Thermistors Replacement

Check mark

Preparation

Check mark

Remove the cabinet and panels

Check mark

Disconnect Connectors

Check mark

Disconnect the lead wire to the reactor

Check mark

Disconnect connectors CN671 and CN672

Check mark

Remove Thermistors

Check mark

Pull out the discharge temperature thermistor from its holder

Check mark

Pull out the defrost thermistor from its holder

Check mark

Pull out the outdoor heat exchanger temperature thermistor from its holder

Run this procedureArrow right

Reversing Valve Coil Replacement

Check mark

Preparation

Check mark

Remove the cabinet and panels

Check mark

Disconnect Connectors

Check mark

Disconnect CN721 (R.V. coil) (MUZ) from the inverter P.C. board

Check mark

Coil Removal

Check mark

Remove the R.V. coil

Run this procedureArrow right

Inverter P.C. Board Replacement

Check mark

Remove the top panel, cabinet, and service panel

Check mark

Disconnect the lead wire to the reactor

Check mark

Disconnect the following connectors

Check mark

Remove the compressor connector (CN61)

Check mark

Remove the screws fixing the heat sink support and the separator

Check mark

Remove the fixing screws of the terminal block support and the back panel

Check mark

Remove the inverter assembly

Check mark

Remove the screw of the ground wire and screw of the terminal block support

Check mark

Remove the heat sink support from the P.C. board support

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Mitsubishi

Explore Other Assets