

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mitsubishi Air Conditioner PEFY-P96NMHSU-E
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Control Box Disassembling
Warning: Exercise caution when removing heavy parts.
Remove the two fixing screws on the cover (A)
Upload a photo of the control box without the cover
Sign off on the control box disassembling
Drainpan Disassembling
Warning: Ensure to drain the water out of the drain pan before removing it.
Removed the twelve fixing screws on the bottom plate (L)?
Removed the bottom plate (L)?
Pulled out the drain pan (M) in the direction of the arrow?
Sign off on the drainpan disassembling
Gas Pipe and Liquid Pipe Thermistors, LEV Disassembling
Exercise caution when removing heavy parts.
1. Remove the control box cover according to the procedure in section 1. Control box.
2. Removing the maintenance cover (1) Remove the ten fixing screws on the cover (D) , cover (E) , and cover (F) to remove the maintenance cover.
3. Removing the thermistor
(1) Disconnect the connector (CN44) from the Indoor controller board.
(2) Remove the thermistor (G) from the thermistor holder (H)on the copper tube.
Thermistor size
Liquid pipe: ø8mm
Gas pipe: ø6mm
Heat Exchanger Disassembling
Exercise caution when removing heavy parts.
1. Remove the control box cover according to the procedure in section 1. Control box.
2. Remove the maintenance cover according to the procedure in section 3. Thermistor (Gas pipe) (Liquid pipe) · LEV.
3. Remove the thermistor and disconnect LEV connector according to the procedure in section 3. Thermistor (Gas pipe) (Liquid pipe) · LEV.
4. Remove the drainpan according to the procedure in section 4. Drainpan.
5. Removing the Heat exchanger.
(1) Remove the four fixing screws on the heat exchanger (N) to remove it.;
Intake Air Thermistor Disassembling
Exercise caution when removing heavy parts.
1. Remove the control box cover according to the procedure in section 1. Control box.
2. Disconnect the connector (CN20) from the Indoor controller board.
3. Pull out the thermistor holder (B) and thermistor (C) on the control box.;
Access the parts list for your equipment in MaintainX.
Drain Pump
PAC-KE05DM-F
External Heater Adapter
PAC-YU25HT
Filter Box
PAC-KE250TB-F
Long-Life Filter
PAC-KE85LAF
Drain Pump
PAC-KE05DM-F
External Heater Adapter
PAC-YU25HT
Filter Box
PAC-KE250TB-F
Long-Life Filter
PAC-KE85LAF
Drain Pump
PAC-KE05DM-F
External Heater Adapter
PAC-YU25HT
Filter Box
PAC-KE250TB-F
Long-Life Filter
PAC-KE85LAF
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













