Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mitsubishi Split-Type, Heat Pump Air Conditioner PUZ-A18NHA2-BS
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Accumulator Disassemble
Warning: This procedure should be performed by trained personnel only.
Upload photo of service panel before removal
Service panel removed
Upload photo of top panel before removal
Top panel removed
Upload photo of front panel before removal
Front panel removed
Upload photo of conduit cover and cord cover before removal
Conduit cover and cord cover removed
4-Way Valve Coil and Linear Expansion Valve Coil Disassemble
(1) Remove the service panel. (See photo 1.)
(2) Remove the top panel. (See photo 1.)
(3) Remove the front panel. (See photo 1.)
(4) Remove the conduit cover and cord cover.
(5) Remove the back panel. (See photo 1.)
(6) Remove the electrical parts box. (See photo 5.)
[Removing the 4-way valve coil (21S4)]
(7) Remove 1 4-way valve coil fixing screw (M4 ✕ 6).
(8) Remove the 4-way valve coil by sliding the coil to the right.
TH6 and TH3 Thermistor Disassemble
Upload photo of the service panel after removal
Upload photo of the top panel after removal
Upload photo of the front panel after removal
Conduit cover and cord cover removed?
Number of back panel fixing screws removed
Upload photo of the back panel after detachment
Connector TH3 (white) or TH6/7 (red) disconnected on the controller circuit board?
Clamp for the lead wire in the rear of the electrical parts box loosened?
Thermistor <Outdoor pipe> (TH3) and thermistor <Outdoor 2-phase pipe> (TH6) pulled out from the sensor holder?
High Pressure Switch Disassemble
Upload photo of service panel after removal
Upload photo of top panel after removal
Upload photo of front panel after removal
Upload photo of conduit cover and cord cover after removal
Upload photo of back panel after removal
Upload photo of electrical parts box after removal
Lead wire of high pressure switch successfully pulled out?
Refrigerant recovered successfully?
Note: Recover refrigerant without spreading it in the air.
4-Way Valve Disassemble
Remove the service panel
Upload a photo of the removed service panel
Remove the top panel
Upload a photo of the removed top panel
Remove the front panel
Upload a photo of the removed front panel
Remove the conduit cover and cord cover
Upload a photo of the removed conduit and cord cover
Remove the back panel
Access the parts list for your equipment in MaintainX.
Inverter Starter Type,Hermetic Compressor - 0,85 KW
SNB130FPBM1
Inverter Starter Type,Hermetic Compressor - 0,85 KW
SNB130FPBM1
Inverter Starter Type,Hermetic Compressor - 0,85 KW
SNB130FPBM1
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













