Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mitsubishi Outdoor Unit Split-Type Air Conditioner MUZ-AP42VG
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Compressor Winding Check
Warning: Disconnect the connector between the compressor and the power module (IC700) before proceeding
Ohmmeter zeroed before measurement
Measure the resistance between the lead wires at point BLK-WHT
Measure the resistance between the lead wires at point BLK-RED
Measure the resistance between the lead wires at point WHT-RED
Judgement
Sign off on the compressor winding check
Thermistor Removal
Warning: Ensure the device is powered off before starting the procedure.
Cabinet and panels removed
Lead wire to the reactor disconnected
Disconnect the following connectors
Discharge temperature thermistor pulled out from its holder
Upload a photo of the removed discharge temperature thermistor
Defrost thermistor pulled out from its holder
Upload a photo of the removed defrost thermistor
Outdoor heat exchanger temperature thermistor pulled out from its holder
Outdoor Fan Motor Removal
(1) Remove the cabinet and panels. (Refer to section 1.)
(2) Disconnect the following connectors:
<Inverter P.C. board>
CN931, CN932 (Fan motor)
(3) Remove the propeller fan nut.
(4) Remove the propeller fan.
(5) Remove the screws fixing the fan motor.
(6) Remove the fan motor.;
R.V. Coil Removal
Section 1: Cabinet and Panels Removal
Cabinet and panels removed
Section 2: Disconnecting Connectors
Disconnect the following connectors
Section 3: R.V. Coil Removal
R.V. coil removed
Sign off on the R.V. coil removal
Compressor / 4-Way Valve Removal
(1) Remove the cabinet and panels. (Refer to section 1.)
(2) Remove the inverter assembly. (Refer to section 2.)
(3) Recover gas from the refrigerant circuit.
NOTE: Recover gas from the pipes until the pressure gauge shows 0 kg/cm2 (0 MPa).
(4) Detach the brazed part of the suction and the discharge pipe connected with compressor.
(5) Remove the nuts of compressor legs.
(6) Remove the compressor.
(7) Detach the brazed part of pipes connected with 4-way valve.;
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













