Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mitsubishi Outdoor Unit Split-Type Air Conditioner MUZ-AP71VG
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Open Phase Check
Warning: Ensure the connector between the compressor and the power module (IC700) is disconnected before starting the procedure.
Inverter activated and normal?
Measure the voltage balance between the terminals. Expected output voltage is 50 - 130 V.
Operation method: Start cooling or heating operation by pressing EMERGENCY OPERATION switch on the indoor unit.
Measurement point: Measure AC voltage between the lead wires at 3 points.
Voltage between BLK (U)-WHT (V)
Voltage between BLK (U)-RED (W)
Voltage between WHT(V)-RED (W)
NOTE: 1. Output voltage varies according to power supply voltage. 2. Measure the voltage by analog type tester. 3. During this check, LED of the inverter P.C. board blinks 9 times.
Compressor Winding Check
Warning: Disconnect the connector between the compressor and the power module (IC700) before proceeding
Ohmmeter zeroed before measurement
Resistance measurement between BLK-WHT
Resistance measurement between BLK-RED
Resistance measurement between WHT-RED
Judgement
Sign off on the compressor winding check
Cabinet Removal
Remove the screws of the service panel
Remove the screws of the top panel
Remove the screw of the valve cover
Remove the service panel
Remove the top panel
Remove the valve cover
Disconnect the power supply and indoor/outdoor connecting wire
Remove the screws of the cabinet
Remove the cabinet
R.V. Coil Removal
Section 1: Cabinet and Panels Removal
Cabinet and panels removed
Section 2: Disconnecting Connectors
Inverter P.C. board connector CN602 (R.V. coil) disconnected
Section 3: R.V. Coil Removal
R.V. coil removed
Sign off on the R.V. coil removal
Outdoor Fan Motor Removal
Section 1: Panel Removal
Top panel removed
Cabinet removed
Service panel removed
Section 2: Disconnecting Connectors
CN931 disconnected
CN932 disconnected
Section 3: Propeller Fan Removal
Propeller fan nut removed
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













