Maritime Geothermal Compressor WH-90-H-B-2S-CC-01
Maritime Geothermal Compressor WH-90-H-B-2S-CC-01

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Maritime Geothermal Compressor WH-90-H-B-2S-CC-01

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Maritime Geothermal Compressor WH-90-H-B-2S-CC-01

Maritime Geothermal Compressor WH-90-H-B-2S-CC-01

Create an account to install this asset package.

Maintenance Plans for Maritime Geothermal Compressor Model WH-90-H-B-2S-CC-01

Integrate maintenance plans directly into your work orders in MaintainX.

Refrigeration Unit Maintenance

Check mark

Vacuuming Procedure

Check mark

Release the nitrogen pressure

Check mark

Connect the vacuum pump to the charging manifold

Check mark

Start the vacuum pump and open the charging manifold valves

Check mark

Ensure vacuum gauge remains at less than 500 microns for at least 1 minute with the vacuum pump valve closed

Check mark

Close the charging manifold valves

Check mark

Shut off and disconnect the vacuum pump

Check mark

Charging Procedure

Check mark

Place a refrigerant tank with the proper refrigerant on a scale and connect it to the charging manifold

Run this procedureArrow right

Heat Exchangers Maintenance

Check mark

Initial Assessment

Check mark

Is there a performance degradation not explained by a refrigeration circuit problem or low loop flow rate?

Check mark

Preparation

Check mark

Disconnect the affected loop

Check mark

Flushing Heat Exchanger

Check mark

Flush heat exchanger with a lime removing solution

Check mark

System Type Verification

Check mark

Select the system type

Check mark

Is the system a warm water open loop system?

Run this procedureArrow right

Compressor Service

Check mark

General Repair Procedure

Check mark

Ensure nitrogen is flowing through the system at the lowest flow rate during brazing procedures

Check mark

Replace the liquid line filter-dryer if the refrigeration system has been exposed to the atmosphere

Check mark

Place a wet rag around any valves being installed to protect non-metallic seats or seals from excessive heat

Check mark

Aim the torch flame away from the valve body

Check mark

Solder only one joint at a time and cool joints down in between

Check mark

Pressure Testing

Check mark

Enter the nitrogen pressure at 10 psig

Check mark

Enter the nitrogen pressure at 25 psig

Run this procedureArrow right

Compressor Maintenance

Check mark

Pumpdown Procedure

Check mark

Place the unit in SERVICE mode via the PC App or LCD interface

Check mark

Ensure electrical power is not turned off at the breaker panel

Check mark

Connect the refrigerant recovery unit to the heat pump’s internal service ports via a refrigeration charging manifold and to a recovery tank

Check mark

Plan to dispose of refrigerant if there was a compressor burnout

Check mark

Ensure refrigerant to water heat exchangers have full flow or are completely drained of fluid

Check mark

Start circulation pumps via building control system if necessary

Check mark

Ensure all hose connections are properly purged of air

Check mark

Start the refrigerant recovery as per the instructions in the recovery unit manual

Run this procedureArrow right

Control Board Replacement

Check mark

Preparation

Check mark

Turn the power off to the unit

Check mark

Take a picture of the control board and connectors for reference

Check mark

Removal of Old Control Board

Check mark

Remove all green terminal strips on the left side, the right side, and the bottom of the control board

Check mark

Remove the red six pin display board connector from the left side of the control board

Check mark

Remove all connectors from the top of the control board

Check mark

Remove the control board from its four corner standoffs

Check mark

Remove any remaining standoffs from the old control board

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Maritime Geothermal

Explore Other Assets