Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Maritime Geothermal Compressor W-185-H-P-5D-PP-01
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Heat Exchangers Maintenance
Initial Assessment
Is there a performance degradation not explained by a refrigeration circuit problem or low loop flow rate?
Loop Disconnection and Flushing
Disconnect the affected loop
Flush heat exchanger with a lime removing solution
System Type Verification
Select the system type
Is the system a warm water open loop system?
Performance Check
Control Board Replacement
Turn the power off to the unit
Take a picture of the control board and connectors for reference
Remove all green terminal strips from the control board
Remove the red six pin display board connector from the left side of the control board
Remove all connectors from the top of the control board
Remove the control board from its four corner standoffs
Remove any remaining standoffs from the old control board
Install the new control board
Remove the new control board from the static bag
LCD Interface (Display) Board Replacement
Power Off
Turn the power off to the unit
Remove Old Display Board
Remove the display board cable connector from the control board
Slice off display board standoff heads
Pull the display board from the unit
Remove the display board cable connector from the back of the display board
Install New Display Board
Place new display board standoffs into cabinet holes
Compressor Replacement
Pump down the unit
Was there a compressor burn out?
Dispose of refrigerant according to local codes
Disconnect piping and remove crankcase heater
Replace the compressor and liquid line filter-dryer
Ensure nitrogen is flowing during brazing procedures
Vacuum the unit
Charge the unit with new refrigerant and operate for 2 hours
Pump down the unit and replace the filter-dryer
Refrigeration Unit Maintenance
Vacuuming Procedure
Release the nitrogen pressure
Connect the vacuum pump to the charging manifold
Start the vacuum pump and open the charging manifold valves
Monitor the vacuum gauge until it remains at less than 500 microns for at least 1 minute with the vacuum pump valve closed
Close the charging manifold valves
Shut off and disconnect the vacuum pump
Charging Procedure
Place a refrigerant tank with the proper refrigerant on a scale and connect it to the charging manifold
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX