MaintainX Asset Hub logo
EnterprisePricing
Maritime Geothermal

Maritime Geothermal Compressor W-185-H-P-5D-PP-01

Need answers fast?
Explore the manual using AI.

Maritime Geothermal Compressor W-185-H-P-5D-PP-01
Maritime Geothermal Compressor W-185-H-P-5D-PP-01

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Maritime Geothermal Compressor W-185-H-P-5D-PP-01

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Maritime Geothermal Compressor W-185-H-P-5D-PP-01

Maritime Geothermal Compressor W-185-H-P-5D-PP-01

Create an account to install this asset package.

Maintenance Plans for Maritime Geothermal Compressor Model W-185-H-P-5D-PP-01

Integrate maintenance plans directly into your work orders in MaintainX.

Heat Exchangers Maintenance

Check mark

Initial Assessment

Check mark

Is there a performance degradation not explained by a refrigeration circuit problem or low loop flow rate?

Check mark

Loop Disconnection and Flushing

Check mark

Disconnect the affected loop

Check mark

Flush heat exchanger with a lime removing solution

Check mark

System Type Verification

Check mark

Select the system type

Check mark

Is the system a warm water open loop system?

Check mark

Performance Check

Run this procedureArrow right

Control Board Replacement

Check mark

Turn the power off to the unit

Check mark

Take a picture of the control board and connectors for reference

Check mark

Remove all green terminal strips from the control board

Check mark

Remove the red six pin display board connector from the left side of the control board

Check mark

Remove all connectors from the top of the control board

Check mark

Remove the control board from its four corner standoffs

Check mark

Remove any remaining standoffs from the old control board

Check mark

Install the new control board

Check mark

Remove the new control board from the static bag

Run this procedureArrow right

LCD Interface (Display) Board Replacement

Check mark

Power Off

Check mark

Turn the power off to the unit

Check mark

Remove Old Display Board

Check mark

Remove the display board cable connector from the control board

Check mark

Slice off display board standoff heads

Check mark

Pull the display board from the unit

Check mark

Remove the display board cable connector from the back of the display board

Check mark

Install New Display Board

Check mark

Place new display board standoffs into cabinet holes

Run this procedureArrow right

Compressor Replacement

Check mark

Pump down the unit

Check mark

Was there a compressor burn out?

Check mark

Dispose of refrigerant according to local codes

Check mark

Disconnect piping and remove crankcase heater

Check mark

Replace the compressor and liquid line filter-dryer

Check mark

Ensure nitrogen is flowing during brazing procedures

Check mark

Vacuum the unit

Check mark

Charge the unit with new refrigerant and operate for 2 hours

Check mark

Pump down the unit and replace the filter-dryer

Run this procedureArrow right

Refrigeration Unit Maintenance

Check mark

Vacuuming Procedure

Check mark

Release the nitrogen pressure

Check mark

Connect the vacuum pump to the charging manifold

Check mark

Start the vacuum pump and open the charging manifold valves

Check mark

Monitor the vacuum gauge until it remains at less than 500 microns for at least 1 minute with the vacuum pump valve closed

Check mark

Close the charging manifold valves

Check mark

Shut off and disconnect the vacuum pump

Check mark

Charging Procedure

Check mark

Place a refrigerant tank with the proper refrigerant on a scale and connect it to the charging manifold

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Maritime Geothermal

Explore Other Assets