Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Lennox Rooftop Unit LGH150
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Filter Maintenance
Filter Inspection and Replacement
Check the condition of the filters
Is the air flow direction marking visible on the filter frame?
Reinstall filters ensuring correct air flow direction
Replace factory-installed filters if within 30 days of initial unit start-up
Ensure filters are replaced with approved filters before building occupancy
Compliance and Safety
Refer to local codes or appropriate jurisdiction for approved filters
Verify that temporary filters are replaced with approved filters to prevent unit damage
1 Yearly Flue Passage And Vent Inspection
Inspection of Components
Inspect the following components for corrosion, deterioration, or debris deposits
Obstruction Removal
Remove any obstructions or blockages found during inspection
Reference Figures
Refer to Figure 5, Figure 6, or Figure 7 for detailed diagrams
Combustion Air Inducer Maintenance
Preparation
Turn off the electrical power to the unit
Turn off the gas supply to the unit
Disassembly
Remove the appropriate component based on unit type
Disconnect the pressure switch air tubing from the combustion air inducer port
Remove and retain the screws securing the combustion air inducer to the flue box
Remove and retain screws from the bracket supporting the vent connector
Cleaning
Burners Maintenance
Preparation
Turn off the electrical power to the unit
Turn off the gas supply to the unit
Access Burner Compartment
Remove the burner compartment access panel
Remove top burner box panel
Remove screws securing burners to burner support and lift the entire burner assembly from the orifices
Clean the burners as necessary
Ensure spark gap on ignition electrode is properly set
2 Yearly Bearing Lubrication
Preparation
Ensure all necessary tools and materials are available, including a hand grease gun and lithium base grease.
Lubrication Process
Select the grease to be used for lubrication
Use a hand grease gun for relubrication.
Add grease until a bead appears at the seal lip contacts.
Post-Lubrication Check
Was a bead of grease visible at the seal lip contacts?
Ensure no excess grease is left around the bearings.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX