

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Lennox Rooftop Unit LGH360
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Rooftop Unit Service
Pre-Service Preparation
Label all wires prior to disconnection
Ensure all necessary tools and equipment are available
Filter Servicing
Check and replace filters as necessary
Post-Service Verification
Verify proper operation after servicing
Describe any issues found during service
Documentation
1 Yearly Flue Passage And Vent Inspection
Inspection of Components
Inspect the following components for corrosion, deterioration, or debris deposits
Obstruction Removal
Remove any obstructions or blockages found during inspection
Reference Figures
Refer to Figure 5, Figure 6, or Figure 7 for detailed diagrams
Flue Passageway Maintenance
Flue Passageway and Flue Box
Remove the combustion air inducer assembly as described in the Combustion Air Inducer subsection.
Remove the flue box cover.
Clean the flue box with a wire brush as required.
Clean the tubes with a wire brush.
Reassemble the unit.
Replace gaskets during reassembly
Burners Maintenance
Preparation
Turn off the electrical power to the unit
Turn off the gas supply to the unit
Access Burner Compartment
Remove the burner compartment access panel
Remove top burner box panel
Burner Removal and Cleaning
Remove screws securing burners to burner support
Lift the entire burner assembly from the orifices
2 Yearly Bearing Lubrication
Preparation
Ensure all motors are lubricated at the factory
Verify that no further lubrication is required for factory-lubricated motors
Blower Shaft Bearings Lubrication
Check that blower shaft bearings are prelubricated
Is it time for the 2-year relubrication?
Select the grease to be used for relubrication
Use a hand grease gun for relubrication
Add grease until a bead appears at the seal lip contacts
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













