

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Lennox Rooftop Unit LGH156
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Combustion Air Inducer Maintenance
Preparation
Turn off the electrical power to the unit
Turn off the gas supply to the unit
Disassembly
Remove the appropriate component based on unit type
Disconnect the pressure switch air tubing from the combustion air inducer port
Remove and retain the screws securing the combustion air inducer to the flue box
Remove and retain two screws from the bracket supporting the vent connector before removing vent connector
Cleaning
1 Yearly Rooftop Unit Service
Pre-Service Precautions
Label all wires prior to disconnection
Verify proper operation after servicing
Filter Servicing
Check filters as shown in Table 1
Replace filters if necessary
Post-Service Verification
Verify proper operation of the unit after servicing
Documentation
Flue Passageway Maintenance
Flue Passageway and Flue Box
Remove the combustion air inducer assembly as described in the Combustion Air Inducer subsection
Remove the flue box cover
Clean the flue box with a wire brush as required
Clean the tubes with a wire brush
Reassemble the unit
Replace gaskets during reassembly
1 Yearly Flue Passage And Vent Inspection
Inspection of Components
Inspect the following components for corrosion, deterioration, or debris deposits
Obstruction Removal
Remove any obstructions or blockages
Reference Figures
Refer to Figure 5, Figure 6, or Figure 7 for guidance
2 Yearly Bearing Lubrication
Preparation
Ensure all necessary tools and materials are available (hand grease gun, lithium base grease).
Select the lithium base grease to be used
Lubrication Process
Verify that the motor is turned off and properly secured.
Clean the area around the bearing to prevent contamination.
Attach the hand grease gun to the bearing fitting.
Pump grease into the bearing until a bead of grease appears at the seal lip contacts.
Post-Lubrication
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













