MaintainX Asset Hub logo
EnterprisePricing
Lennox

Lennox Rooftop Unit LGH180

Need answers fast?
Explore the manual using AI.

Lennox Rooftop Unit LGH180
Lennox Rooftop Unit LGH180

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Lennox Rooftop Unit LGH180

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Lennox Rooftop Unit LGH180

Lennox Rooftop Unit LGH180

Create an account to install this asset package.

Maintenance Plans for Lennox Rooftop Unit Model LGH180

Integrate maintenance plans directly into your work orders in MaintainX.

Flue Passageway Maintenance

Check mark

Flue Passageway and Flue Box

Check mark

Remove the combustion air inducer assembly as described in the Combustion Air Inducer subsection.

Check mark

Remove the flue box cover.

Check mark

Clean the flue box with a wire brush as required.

Check mark

Clean the tubes with a wire brush.

Check mark

Reassembly

Check mark

Reassemble the unit.

Check mark

Replace gaskets during reassembly

Run this procedureArrow right

1 Monthly Filter Maintenance

Check mark

Filter Inspection and Replacement

Check mark

Check the following filter conditions

Check mark

Is the filter in need of replacement?

Check mark

Replace the filter if necessary

Check mark

Ensure air flow direction marking on filter frame is correct when reinstalling

Check mark

Replace factory-installed filters within 30 days of initial unit start-up

Check mark

Replace temporary filters before building is occupied

Check mark

Compliance and Safety

Check mark

Refer to local codes or appropriate jurisdiction for approved filters

Run this procedureArrow right

1 Yearly Flue Passage And Vent Inspection

Check mark

Inspection of Components

Check mark

Inspect the following components for corrosion, deterioration, or debris deposits

Check mark

Obstruction Removal

Check mark

Remove any obstructions or blockages found during inspection

Check mark

Reference Figures

Check mark

Refer to Figure 5, Figure 6, or Figure 7 for detailed diagrams

Run this procedureArrow right

Burners Maintenance

Check mark

Preparation

Check mark

Turn off the electrical power to the unit

Check mark

Turn off the gas supply to the unit

Check mark

Access Burner Compartment

Check mark

Remove the burner compartment access panel

Check mark

Remove top burner box panel

Check mark

Burner Removal and Cleaning

Check mark

Remove screws securing burners to burner support

Check mark

Lift the entire burner assembly from the orifices

Run this procedureArrow right

2 Yearly Bearing Lubrication

Check mark

Preparation

Check mark

Ensure all motors are lubricated at the factory

Check mark

Verify that no further lubrication is required for factory-lubricated motors

Check mark

Blower Shaft Bearings Lubrication

Check mark

Check that blower shaft bearings are prelubricated

Check mark

Is it time for the 2-year relubrication?

Check mark

Select the grease to be used for relubrication

Check mark

Use a hand grease gun for relubrication

Check mark

Add grease until a bead appears at the seal lip contacts

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Lennox

Explore Other Assets