Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Ingersoll Rand Air Dryer D950IN-A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2 Yearly / 4000 Hourly Fan Pressure Switch Replacement
Attention! Perform pressure test with inert gases only (helium, nitrogen).
No parts of the system are under pressure.
No parts of the system are electrically powered.
Fan pressure switch replaced.
1 Weekly / 40 Hourly Air Dryer Check
Attention! Perform pressure test with inert gases only (helium, nitrogen).
No parts of the system are under pressure.
No parts of the system are electrically powered.
Verify the temperature on the control panel display
Condensate is drained regularly.
Filter mesh of the condensate drain system is clean.
Sign off on the air dryer check
1 Yearly Service Unit Replacement
Dryer disconnected from electrical supply and depressurized to 0 bar
Electrical connector unscrewed and removed from the service unit
4 screws that hold the unit unscrewed
Service Unit removed from the drain
Filter mesh cleaned
Service Unit replaced
Four screws screwed into housing
Electrical connector connected
Dryer connected to power supply
1 Yearly / 2000 Hourly Air Dryer Maintenance
Attention! Perform pressure test with inert gases only (helium, nitrogen).
Before attempting any maintenance operation, make sure that:
No parts of the system are under pressure.
No parts of the system are electrically powered.
Check if the flexible tube used for condensate drainage is damaged and replace it if necessary.
Check if all connecting pipes are properly tightened and fixed.
At the end of the above mentioned operations, check if the dryer is working properly.
Sign off on the air dryer maintenance
1 Monthly / 200 Hourly Air Dryer Maintenance
Attention! Perform pressure test with inert gases only (helium, nitrogen).
Before attempting any maintenance operation, make sure that:
No parts of the system are under pressure.
No parts of the system are electrically powered.
Clean the condenser with compressed air, taking care not to damage the condenser fins.
At the end of the above mentioned operations, check if the dryer is working properly.
Check the condition of any filters installed with and inside the dryer. Replace elements as needed.
Refer to the 'Filters for Compressed Air' manual for correct servicing procedures.
Sign off on the air dryer maintenance
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX