Manual for Ingersoll Rand Air Compressor R90IU-10

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ingersoll Rand Air Compressor R90IU-10

Ingersoll Rand Air Compressor R90IU-10

Create an account to install this asset package.

Maintenance Plans for Ingersoll Rand Air Compressor Model R90IU-10

Integrate maintenance plans directly into your work orders in MaintainX.

1000 Hourly / 6 Monthly Food Grade Coolant Replacement

Check mark

Warning: Do not operate unit past this 1000 hour change interval, as coolant degradation will occur.

Check mark

Enter the current hours of operation

Check mark

Enter the date of the last coolant change

Check mark

Is the coolant change due?

Check mark

Was the coolant replaced?

Check mark

Sign off on the coolant replacement

Run this procedureArrow right

Initial 50 Hours Zinc Anode Check

Check mark

NOTE: On some sea water cooled models the oil cooler and after cooler are fitted with sacrificial zinc anodes (pencils) that are located in the end bonnets of the coolers. These sacrificial zinc anodes should be checked after the first 50 hours of operation to determine if corrosive conditions exist. If satisfactory this interval may be extended to 500 hours.

Check mark

Is the sacrificial zinc anode 50% corroded?

Check mark

If sacrificial zinc anode is 50% corroded it should be replaced.

Check mark

Are you operating in coastal/harbour waters?

Check mark

Coastal/harbour waters can contain corrosive chemicals from pollution and may reduce anode/cooler life.

Check mark

Effects of corrosion or erosion are specifically excluded from warranty considerations.

Check mark

Sign off on the zinc anode check

Run this procedureArrow right

3 Monthly Air Compressor Check

Check mark

Operate the safety valve manually to verify that the valve mechanism is functioning correctly and that a small amount of air is released.

Check mark

Check all hoses for signs of deterioration, cracks, hardening etc.

Check mark

Replace all hoses every 4 years.

Check mark

Sign off on the air compressor check

Run this procedureArrow right

8000 Hourly / 2 Yearly Ultra Coolant Replacement

Check mark

Warning: Only trained personnel should perform this procedure.

Check mark

Position a suitable container under the drain plug.

Check mark

Was the coolant drained completely?

Check mark

Remove additional coolant from the airend discharge tube and oil coolers from their respective plugs.

Check mark

Was the additional coolant removed?

Check mark

Replace the coolant filter.

Check mark

Was the coolant filter replaced?

Check mark

Replace the separator element.

Check mark

Was the separator element replaced?

Run this procedureArrow right

1 Monthly Air Compressor Check

Check mark

Check the cooler(s) for build up of foreign matter

Check mark

Cleaned the cooler(s) if necessary?

Check mark

On water cooled and sea water cooled models, check the water input line strainer for build up of foreign matter

Check mark

Cleaned the water input line strainer if necessary?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.