Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Ingersoll Rand Air Compressor R150IU-140
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 150 Hours Coolant Filter Replacement
Loosen filter element with the correct tool
Remove the element from the housing
Place the old element in a sealed bag and dispose of in a safe way
Clean the mating face of the housing
Remove the new Ingersoll Rand replacement element from its protective package
Apply a small amount of lubricant to the element seal
Screw the new element down until the seal makes contact with the housing, then hand tighten a further half turn
Start the compressor and check for leaks
Sign off on the coolant filter replacement
2000 Hourly Coolant Filter Replacement
Loosen filter element with the correct tool
Remove the element from the housing
Place the old element in a sealed bag and dispose of in a safe way
Clean the mating face of the housing
Remove the new Ingersoll Rand replacement element from its protective package
Apply a small amount of lubricant to the element seal
Screw the new element down until the seal makes contact with the housing, then hand tighten a further half turn
Start the compressor and check for leaks
Sign off on the coolant filter replacement
2000 Hourly / 6 Monthly Air Compressor Maintenance
Take coolant sample for fluid analysis
Check scavenge screen for blockage, clean if required
Check the calibration of the pressure transducer
1 Yearly Air Filter Replacement
1. Open Air Filter
• Unscrew the retaining nut and withdraw the old elements
• Fit the new element ensuring that the retaining nut is secured
2. Cannister Air Filter
• Unclip the retaining cap and withdraw the old elements)
. Fit new elements) and refit the retaining cap.
3. High Dust Air Filter
Unscrew the retaining nut and remove the cannister lid
Withdraw the old element(s).
1000 Hourly / 6 Monthly Food Grade Coolant Replacement
Warning: Do not operate unit past the 1000 hour change interval, as coolant degradation will occur.
Enter the current operating hours of the unit
Enter the date of the last coolant change
Is the coolant due for replacement?
Was the coolant replaced?
Sign off on the coolant replacement
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX