Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Ingersoll Rand Air Compressor HP50–PE
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Air Compressor Maintenance
Check the coolant level and replenish if necessary.
Visual check of machine for any leaks, dust build up or unusual noise or vibration
Report immediately, contact Ingersoll Rand authorized distributor for assistance if in doubt
When compressor is receiver mounted
Drain air receiver of condensate, or check that automatic drain is operating.
Visual check condition of package pre–filter
Blow clean if needed.
Sign off on the daily air compressor maintenance
2 Yearly / 8000 Hourly Air Compressor Maintenance
Change drive belt and gas spring.
Replace the Ultra Coolant at whichever interval occurs first.
COOLANT CHANGE PROCEDURE
It is better to drain the coolant immediately after the compressor has been operating as the liquid will drain more easily and any contaminant will still be in suspension.
1. Stop the machine, electrically isolate and vent all trapped pressure.
2. Place a suitable container close to the drain valve.
3. Slowly remove fill/vent cap.
4. Remove plug from drain valve.
5. Open the drain valve and drain coolant into container.
6 Yearly / 16000 Hourly Air Compressor Maintenance
This maintenance procedure is to be performed every 6 years or after every 16000 hours of operation, whichever comes first, or as defined by local or national legislation.
Separator Tank Maintenance
Cover plate and necessary fittings removed?
Interior cleaned thoroughly?
All internal surfaces inspected?
Sign off on the air compressor maintenance
Pressure Vessel Inspection
Pressure vessel inspection frequency may be otherwise defined by local or national legislation.
Separator vessel and air receiver when fitted.
Fully inspect all external surfaces, and fittings. Report any excessive corrosion, mechanical or impact damage, leakage or other deterioration.
1 Monthly / 100 Hourly Air Compressor Maintenance
Remove and clean package pre–filter, replace if needed
Check the cooler(s) for build up of foreign matter. Clean if necessary by blowing out with air or by pressure washing.
COOLER CLEANING PROCEDURE
1. Stop the machine, electrically isolate and vent all trapped pressure.
2. Remove the top cover to obtain access to the cooler.
3. Clean the cooler.
4. Rebuild in reverse order.
Check hoses and fittings for leaks – tighten as required.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX