

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Hyster Forklift H250HD
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Twist Locks Maintenance
Removal
Tag and remove hydraulic lines from twist lock motor and disconnect wiring from splitter box
Remove four bolts holding plate in place
Slide out twist lock assembly by pulling on hydraulic motor end
Disassemble
Place twist lock assembly on flat area
Remove four socket head bolts and slide out hydraulic motor
Remove key
Remove four socket head screws attached to collet and ring
Extension Cylinders Maintenance
Removal
Retract attachment to 20-ft position and shut down engine
Disconnect hydraulic lines at chain end and disconnect electrical plugs at chain end
Remove bracket holding chain and hose clamp closest to chain
Start engine and extend extension beam approximately 1200 mm allowing removal of pin at rod end of extension cylinder
Remove snap ring and pin from rod end of extension cylinder
Retract attachment to 20-ft position and shut down engine
Using a crane or lift truck, pull extension beam out approximately 1200 mm. Carefully guide hose/cable chain into center frame
Remove two bolts holding interface box and reposition box to prevent damage
End Beams Hose Replacement
NOTE: Hydraulic hoses and electrical cable are inside bent tube with a limited diameter. This does not allow individual replacement of hoses or electrical cable.
Disconnect hydraulic hoses and electrical cable at lower side of beam.
Connect a string to one of the hoses and pull out hoses from higher end.
Replace any defective hoses or cables and tape hoses, cable, and string together.
NOTE: Tape hoses and cables in such a way that each hose coupling is at a different position and can move separately in order to follow bend in tube. Make sure each hose is marked.
Pull attached string and guide upper end of taped hose bundle into tube.
Connect hoses at correct connections.
Sign off on the hose replacement
Hooks Replacement
INSPECT
WARNING
The lifting hooks are safety critical components due to the fact that it is the hook that carries all the load when picking up and carrying a container. Hooks are a wearing part and should be inspected for wear and or damage on a regular basis.
1. Check hook for cracks. Replace hook if damaged.
2. Check inside angle of hook. New hooks have 22 mm (0.87 in.) of material between flat portion of hook and top of hook. The hook should be replaced if worn area leaves less than 15 mm (0.59 in.) from start of wear area to flat portion of hook. See Figure 9 and Figure 10.
3. Check wear area of hook where corner casting of container is carried. This area should be inspected and when wear is more than 5% of original thickness, hook should be replaced. See Figure 9 and Figure 10.
4. Check tightness between nuts and threads of hook. Hook should be replaced if threads of hook become worn. See Figure 9.
5. The pin that hook is secured through can wear and should be replaced if excess play is discovered.
WARNING
Forklift Maintenance
Inspect main attachment components for damage, cracks, and distortion
Inspect signal and control systems for correct operation
Check hydraulic pressures periodically
Check all hydraulic cylinders for leaks and reseal if necessary
Inspect all hydraulic hoses for damage and leakage. Replace any damaged or leaking hoses
Sign off on the forklift maintenance
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













