

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Hammer Strength Linear Leg Press HSLLP
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Weekly Training Machine Maintenance
Visually inspect all hardware for loosening, tampering or wear
Check jam nut on weight stack for tightness
Inspect all accessory and or carabiner clips or connecting links for wear
Check condition of hand grips
Check cables for stretch and adjust as necessary by loosening the large nut on top of the weight stack and screw in the threaded plug until cable is tight and the weight stack pin goes in all holes easily. Tighten the large nut to complete the adjustment
Sign off on the machine maintenance
1 Monthly Training Machine Maintenance
1. Clean Guide rods with a cotton cloth and break-free.
• Clean Guide Rods with break-free on a cloth and wipe off old residue. Clean tops of bearings at stack and inspect for heavy buildup on rods below head plate (lift half of stack and do a visual inspection, then clean as necessary).
2. Hardware should be checked for looseness. Tighten as required using metric tools.
• Inspect hardware on all machines and tighten any bolts or nuts that may have loosened over the life of the product.
1 Daily Training Machine Maintenance
Upholstery wiped down with a mild soap and water or comparable all purpose cleaner
Cables visually inspected for wear at and around connections and along entire length of cable
Cables replaced at first sign of wear
Training Machine Maintenance
Clean Shields
Clean Hand grips with mild soap and water
Clean Wax frames with a standard, non-abrasive, wax finish
Handgrips checked for wear or damage
All paint chips filled immediately with touch-up paint
Lubricate Guide rods with Silicone Compound (part number 3238401). Apply the lubricant to a cotton cloth, then run the cotton cloth up and down the guide rods as needed
Sign off on the machine maintenance
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













