MaintainX, an Autodesk company
EnterprisePricing
Goulds Pumps

Goulds Pumps Pump VIT 9RC

Need answers fast?
Explore the manual using AI.

Goulds Pumps Pump VIT 9RC
Goulds Pumps Pump VIT 9RC

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Goulds Pumps Pump VIT 9RC

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Goulds Pumps Pump VIT 9RC

Goulds Pumps Pump VIT 9RC

Create an account to install this asset package.

Maintenance Plans for Goulds Pumps Pump Model VIT 9RC

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Maintenance

Check mark

Cleaning

Check mark

Clean dirt, oil, and grease from driver and discharge head

Check mark

Clean driver ventilation passage to prevent overheating

Check mark

Inspection and Tightening

Check mark

Tighten all loose bolts

Check mark

Check for excessive vibration

Check mark

Operation Check

Check mark

Check for leakage through stuffing box while pump is in operation

Check mark

Do not tighten gland nuts unless necessary

Run this procedureArrow right

Taperlock Construction Bowl Disassembly

Check mark

Remove capscrews securing top bowl to intermediate bowl

Check mark

Slide discharge bowl and top bowl off the pump shaft

Check mark

Pull shaft out and strike impeller hub

Check mark

Insert screwdriver into taperlock slot and spread it open

Check mark

Slide taperlock and impeller off the pump shaft

Check mark

Repeat procedures until bowl assembly is completely disassembled

Run this procedureArrow right

Keyed Bowl Disassembly

Check mark

Remove capscrews securing top bowl to intermediate bowl

Check mark

Slide top bowl off the pumpshaft

Check mark

Remove capscrews and split thrust ring from pump shaft

Check mark

Slide impeller off the pumpshaft and remove the key

Check mark

If impeller is seized, strike with a fiber mallet to drive it off the pumpshaft

Check mark

Repeat procedures until the bowl assembly is completely disassembled

Run this procedureArrow right

Packing Replacement

Check mark

Initial Inspection and Adjustment

Check mark

Is the leakage rate exceeding two drops per second?

Check mark

Is there no leakage or is the stuffing box overheating?

Check mark

Pump Shutdown and Cooling

Check mark

Stop the pump and allow packing to cool.

Check mark

Coupling Guard Reinstallation

Check mark

Reinstall the coupling guard before restarting the pump.

Check mark

Stuffing Box Adjustment

Check mark

With the pump in operation, tighten the gland nuts one-quarter turn for each adjustment.

Run this procedureArrow right

Impeller Adjustment

Check mark

Pre-Adjustment Checks

Check mark

Ensure mechanical seal is not secured to the shaft prior to impeller adjustment.

Check mark

Verify the following conditions for the pump

Check mark

Adjustment Procedure

Check mark

Turn the adjusting plate (613) to adjust the impeller.

Check mark

Refer to the Outline Drawing for the specific unit and note the correct adjustment.

Check mark

If the pump has a thrust pot, ensure the thrust is installed before adjusting the impeller position.

Check mark

Adjust the impeller position using the adjust nut on the thrust pot.

Check mark

Post-Adjustment Verification

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Goulds Pumps

Explore Other Assets