

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Goulds Pumps Pump VIT 6A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Packing Replacement
Initial Inspection and Adjustment
Check leakage rate of the pump
Is the leakage rate exceeding two drops per second?
Stop the pump if there is no leakage or the stuffing box overheats
Allow packing to cool before restarting the pump
Safety Precautions
Reinstall the coupling guard before restarting the pump
Stuffing Box Adjustment
Tighten the gland nuts one-quarter turn with the pump in operation
Taperlock Construction Bowl Disassembly
Remove capscrews securing top bowl to intermediate bowl
Slide discharge bowl and top bowl off the pump shaft
Pull shaft out as far as possible
Strike impeller hub using a taperlock driver or equivalent
Insert a screwdriver into the slot in the taperlock and spread it open
Slide the taperlock and impeller off the pump shaft
Repeat procedures until the bowl assembly is completely disassembled
Impeller Wear Ring Removal
Cutting Grooves on the Wear Ring
Cut two 'V' shaped grooves on the impeller wear ring approximately 180 degrees apart using a diamond point chisel.
Removing the Wear Ring
Knock the end of one half of the ring out with a chisel or drift.
Pry the ring off.
Special Materials Handling
Set up the impeller in a lathe.
Machine the wear ring off using extreme care not to machine or damage the ring seat.
Head / Column Disassembly
Remove the driveshaft between the gear and the prime mover
Remove the electrical connections at the conduit box and tag the electrical leads
Uncouple driver (or gear box) from pump shaft and mounting flanges
Lift off driver or gear box by the lifting lugs or eyebolts as furnished
Warning: Never try to lift entire pump assembly by the lifting lugs or eyebolts furnished for the driver only
Disconnect discharge head from the discharge piping
Remove all hold down bolts and external piping
Remove coupling, packing box and proceed with disassembly down to the bowls
Turbine Bowl – Wear Ring Removal
Remove set screws or grind off tack weld
Cut two 'V' shaped grooves on the bowl wear ring
Knock the end of one half of the ring in and pry the ring out
Machine the wear ring off for special materials
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













