Manual for Goulds Pumps Pump VIT 8RA

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Goulds Pumps Pump VIT 8RA

Goulds Pumps Pump VIT 8RA

Create an account to install this asset package.

Maintenance Plans for Goulds Pumps Pump Model VIT 8RA

Integrate maintenance plans directly into your work orders in MaintainX.

Head / Column Disassembly

Check mark

Remove the driveshaft between the gear and the prime mover

Check mark

Remove the electrical connections at the conduit box

Check mark

Tag the electrical leads for reassembly

Check mark

Uncouple driver or gear box from pump shaft and mounting flanges

Check mark

Lift off driver or gear box by the lifting lugs or eyebolts

Check mark

Disconnect discharge head from the discharge piping

Check mark

Remove all hold down bolts and external piping

Check mark

Remove coupling, packing box and proceed with disassembly down to the bowls

Check mark

Warning: Never try to lift entire pump assembly by the lifting lugs or eyebolts furnished for the driver only

Run this procedureArrow right

Taperlock Construction Bowl Disassembly

Check mark

Remove capscrews securing top bowl to intermediate bowl

Check mark

Slide discharge bowl and top bowl off the pump shaft

Check mark

Pull shaft out as far as possible

Check mark

Strike impeller hub using a taperlock driver to drive the impeller off the taperlock

Check mark

Insert a screwdriver into the slot in the taperlock and spread it open

Check mark

Slide the taperlock and impeller off the pump shaft

Check mark

Repeat the procedures until the bowl assembly is completely disassembled

Run this procedureArrow right

Keyed Bowl Disassembly

Check mark

Remove capscrews securing top bowl to intermediate bowl

Check mark

Slide top bowl off the pumpshaft

Check mark

Remove capscrews and split thrust ring from pump shaft

Check mark

Slide impeller off the pumpshaft and remove the key

Check mark

If impeller is seized, strike with a fiber mallet to drive it off the pumpshaft

Check mark

Repeat procedures until the bowl assembly is completely disassembled

Run this procedureArrow right

Packing Replacement

Check mark

Initial Inspection and Adjustment

Check mark

Is the leakage rate exceeding two drops per second?

Check mark

Is there no leakage or is the stuffing box overheating?

Check mark

Pump Shutdown and Cooling

Check mark

Stop the pump and allow packing to cool.

Check mark

Coupling Guard Reinstallation

Check mark

Reinstall the coupling guard before restarting the pump.

Check mark

Stuffing Box Adjustment

Check mark

Tighten the gland nuts one-quarter turn for each adjustment.

Run this procedureArrow right

Pump Maintenance

Check mark

Cleaning

Check mark

Clean all pump parts thoroughly with a suitable cleaner

Check mark

Inspection

Check mark

Check bearing retainers for deformation and wear

Check mark

Check shafts for straightness and excessive wear on bearing surfaces

Check mark

Enter the average total run-out of the shafts (in TIR per foot)

Check mark

Is the average total run-out less than 0.0005” TIR per foot and not exceeding 0.005” T.I.R. for every 10 feet of shafting?

Check mark

Visually check impellers and bowls for cracks and pitting

Check mark

Check all bowl bearings for excessive wear and corrosion

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Goulds Pumps

Explore Other Assets