

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Goulds Pumps Pump VIT 7C
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Taperlock Construction Bowl Disassembly
Remove capscrews securing top bowl to intermediate bowl
Slide discharge bowl and top bowl off the pump shaft
Pull shaft out as far as possible
Strike impeller hub using a taperlock driver to drive the impeller off the taperlock
Insert a screwdriver into the slot in the taperlock and spread it open
Slide the taperlock and impeller off the pump shaft
Repeat the procedures until the bowl assembly is completely disassembled
Pump Maintenance
Cleaning
Clean all pump parts thoroughly with a suitable cleaner
Inspection
Check bearing retainers for deformation and wear
Check shafts for straightness and excessive wear on bearing surfaces
Is the average total run-out less than 0.0005” TIR per foot and not exceeding 0.005” T.I.R. for every 10 feet of shafting?
Visually check impellers and bowls for cracks and pitting
Check all bowl bearings for excessive wear and corrosion
Replacement
Impeller Adjustment
Pre-Adjustment Checks
Is the mechanical seal secured to the shaft?
Has the thrust been installed if the pump has a thrust pot?
Adjustment Process
Turn the adjusting plate (613) to adjust the impeller.
Refer to the Outline Drawing for the specific unit and note the correct adjustment.
Temperature Considerations
Is the liquid temperature between -50º to ambient conditions?
Has the pump surface temperature reached equilibrium for liquids in excess of the range?
Impeller Wear Ring Removal
Cut two 'V' shaped grooves on the impeller wear ring
Knock the end of one half of the ring out and pry the ring off
Machine the wear ring off for special materials
Bowl Assembly
Check that all the parts are in place
Verify the securing method for turbine bowl impellers
Match mark bowl assembly in sequence of disassembly
Follow procedures applicable to the construction supplied
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













