Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Goulds Pumps Pump VIT 6DH
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Bowl Assembly
Check that all the parts are in place
Verify the securing method for turbine bowl impellers
Match mark bowl assembly in sequence of disassembly
Follow procedures applicable to the construction supplied
Packing Replacement
Initial Inspection and Adjustment
Check leakage rate of the pump
Is the leakage rate exceeding two drops per second?
Stop the pump if there is no leakage or the stuffing box overheats
Allow packing to cool before restarting the pump
Adjustment Procedure
Reinstall the coupling guard before restarting the pump
Tighten the gland nuts one-quarter turn with the pump in operation
Allow packing to equalize against increased pressure
Pump Maintenance
Cleaning
Clean dirt, oil, and grease from driver and discharge head
Clean driver ventilation passage to prevent overheating
Inspection and Tightening
Tighten all loose bolts
Check for excessive vibration
Operation Check
Check for some leakage through stuffing box while pump is in operation
Do not tighten gland nuts unless necessary
Keyed Bowl Disassembly
Remove capscrews securing top bowl to intermediate bowl
Slide top bowl off the pumpshaft
Remove capscrews and split thrust ring from pump shaft
Slide impeller off the pumpshaft and remove the key
If impeller is seized, strike with a fiber mallet to drive it off the pumpshaft
Repeat procedures until the bowl assembly is completely disassembled
Taperlock Construction Bowl Disassembly
Remove capscrews securing top bowl to intermediate bowl
Slide discharge bowl and top bowl off the pump shaft
Pull shaft out and strike impeller hub to drive impeller off taperlock
Insert screwdriver into taperlock slot and spread it open
Slide taperlock and impeller off the pump shaft
Repeat procedures until bowl assembly is completely disassembled
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX