Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Goulds Pumps Pump VIT 8DH
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Maintenance
Cleaning
Clean dirt, oil, and grease from driver and discharge head
Clean driver ventilation passage to prevent overheating
Inspection and Tightening
Tighten all loose bolts
Check for excessive vibration
Leakage and Lubrication
Check for some leakage through stuffing box while pump is in operation
Ensure gland nuts are not tightened unless necessary
Impeller Adjustment
Pre-Adjustment Checks
Ensure mechanical seal is not secured to the shaft
Verify that the shaft can move up or down within the seal assembly
Adjustment Process
Turn the adjusting plate (613) to adjust the impeller
Refer to the Outline Drawing for the correct adjustment
If pump has thrust pot, ensure thrust is installed before adjusting impeller position
Adjust impeller position using the adjust nut on the thrust pot
Temperature Considerations
Pump Maintenance
Cleaning
Clean all pump parts thoroughly with a suitable cleaner
Inspection
Check bearing retainers for deformation and wear
Check shafts for straightness and excessive wear on bearing surfaces
Enter the average total run-out of the shafts
Is the average total run-out less than 0.0005” TIR per foot and not exceeding 0.005” T.I.R. for every 10 feet of shafting?
Visually check impellers and bowls for cracks and pitting
Check all bowl bearings for excessive wear and corrosion
Bowl Assembly
Initial Setup
Match mark bowl assembly in sequence of disassembly
Component Check
Check that all the parts are in place
Impeller Securing
Determine impeller securing method
Reassembly
Reassemble the bowl assembly following the match marks
Final Inspection
Packing Replacement
Initial Inspection and Adjustment
Check leakage rate of the pump
Is the leakage rate exceeding two drops per second?
Stop the pump if there is no leakage or the stuffing box overheats
Allow packing to cool before restarting the pump
Safety Precautions
Reinstall the coupling guard before restarting the pump
Stuffing Box Adjustment
Tighten the gland nuts one-quarter turn with the pump in operation
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX