Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Getinge Steam Sterilizer 522LS
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Steam Sterilizer Inspection
Pre-Inspection Requirements
Ensure the Installation Checklist is completed by a Getinge representative or its agent
Equipment Inspection and Evaluation
Run qualifying tests to inspect and evaluate the equipment
Is the equipment operating to specification?
Post-Inspection Procedures
Schedule an in-service review with the customer's Getinge sales representative
Has the in-service review been completed?
Release the equipment to the customer for use
Heater Circuit Connections Check
CAUTION — POSSIBILITY OF DAMAGE TO EQUIPMENT
Check the torque of the three-phase supply terminals
Check the torque of the contactor terminals
Check the torque of the heating element terminals
Check the torque of the heating element flange bolts
Reference Figures
See Figure 5–7 for the GTS-30A Steam Boiler
See Figure 5–8 on page 5–9 for the CAS-30C and the SSB30C Steam Boiler
Steam Sterilizer Installation Inspection
Initial Inspection
Inspect and remove any debris
Tighten any loose hardware
Utility and Compliance Check
Check that utilities are connected properly and piping and wiring comply with all applicable codes
Check that the sterilizer is anchored to the floor and seismic anchoring (if required) complies with all applicable codes
Panel Installation Check
Check that the panels are installed and secure
Safety Check
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX