The Genie Articulated Boom Lift Z-30/20N RJ is a versatile aerial work platform designed for efficient operation in tight spaces. This reliable equipment from Genie offers exceptional reach and maneuverability, making it ideal for construction, maintenance, and industrial applications.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Genie Articulated Boom Lift Z-30/20N RJ
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
100 Hourly Lubrication
Warning: This procedure requires trained personnel with PPE!
Genie specifications require that this procedure be performed every 100 hours.
Located the grease fitting on the tank side turntable cover bulkhead?
Amount of grease pumped into the turntable rotation bearing
Rotated the turntable in increments of 4 to 5 inches / 10 to 13 cm at a time and repeated this step until the entire bearing has been greased?
Located the 2 grease fittings on top of the worm drive housing?
Amount of grease pumped into the gear
Grease seen coming out of the side of the gear housing?
Greased each tooth on the outside of the turntable rotation bearing?
1 Daily Inspection
Inspect the Manuals and Decals
Operator's and safety manuals are present and complete in the storage container on the platform
Pages of each manual are legible and in good condition
All decals on the machine are legible and undamaged
Perform Pre-operation Inspection
Pre-operation inspection completed
Perform Function Tests
Function tests completed
Sign off on the daily inspection
Alarm Package (if equipped) Testing
Note: Genie specifications require that this procedure be performed every 250 hours or quarterly, whichever comes first.
Turn the key switch to ground controls and pull out the red Emergency Stop buttons to the on position at both ground and platform controls. The flashing beacon should be on and flashing.
Hold the function enable toggle switch to either side, then move the primary boom toggle switch to the down position, hold for a moment then release it.
Hold the function enable toggle switch to either side, then move the secondary boom toggle switch to the down position, hold for a moment then release it.
Hold the function enable toggle switch to either side, then move the jib boom toggle switch to the down position, hold for a moment then release it. The descent alarm should sound when each control toggle switch is held down.
Turn the key switch to platform controls. The flashing beacon should be on and flashing.
Press down the foot switch.
Move the primary boom toggle switch to the down position, hold for a moment then release it.
Move the secondary boom toggle switch to the down position, hold for a moment then release it.
Batteries Check
Warning: This procedure requires protective clothing and eye wear.
Disconnect each battery pack from the machine.
Release the battery pack latches and rotate each battery pack out and away from the chassis.
Remove the cover from each battery box.
Battery cable connections are free of corrosion.
Battery retainers and cable connections are tight.
Fully charge the batteries.
Allow the batteries to rest 24 hours before continuing this procedure to allow the battery cells to equalize.
Remove the battery vent caps and check the specific gravity of each battery cell with a hydrometer.
Drive Brakes Testing
Warning: Collision hazard. Be sure that the machine is not in free-wheel or partial free-wheel configuration.
Test area is firm, level and free of obstructions
Upload a photo of the marked test line on the ground
Boom is in the stowed position
Key switch is turned to platform controls
Machine reached top drive speed before reaching the test line
Distance between the test line and your machine reference point
Brakes able to hold the machine on any slope it is able to climb
Sign off on the brake test
Access the parts list for your equipment in MaintainX.
Lift Cylinder Safety Chock
36555
Motor Controller Programmer
56303
O-ring Field Service Kit
49612
Resistor
27287
Z-30/20N Service Manual
139378
Lift Cylinder Safety Chock
36555
Motor Controller Programmer
56303
O-ring Field Service Kit
49612
Resistor
27287
Z-30/20N Service Manual
139378
Lift Cylinder Safety Chock
36555
Motor Controller Programmer
56303
O-ring Field Service Kit
49612
Resistor
27287
Z-30/20N Service Manual
139378
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX