MaintainX Asset Hub logo
EnterprisePricing
EZ Dock

EZ Dock Floating Dock 206027BS-**

Need answers fast?
Explore the manual using AI.

EZ Dock Floating Dock 206027BS-**
EZ Dock Floating Dock 206027BS-**

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for EZ Dock Floating Dock 206027BS-**

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

EZ Dock Floating Dock 206027BS-**

EZ Dock Floating Dock 206027BS-**

Create an account to install this asset package.

Maintenance Plans for EZ Dock Floating Dock Model 206027BS-**

Integrate maintenance plans directly into your work orders in MaintainX.

Spoke Roller Adjustment

Check mark

Preparation

Check mark

Ensure you have the correct roller kit for your model

Check mark

Adjustment Process

Check mark

Identify the current position of the roller and spacer links on the shaft

Check mark

Is the roller positioned too high or too low?

Check mark

Reposition the roller and spacer links on the shaft as needed

Check mark

Enter the number of adjustments made to achieve the correct position

Check mark

Recommended Roller Position

Check mark

Verify the recommended roller position for your model

Run this procedureArrow right

Bow Section Assembling

Check mark

Preparation

Check mark

Ensure all tools are available

Check mark

Small Bow Section Installation

Check mark

Insert the small bow section into the holes near the front of the entry section

Check mark

Install bolts for small bow section

Check mark

Full Bow Section Installation

Check mark

Place the full bow section onto the front of the entry section and align it

Check mark

Install bolts and washers for full bow section

Check mark

Refer to page 12 for in-line EZ Port MAX applications

Run this procedureArrow right

Keel Roller Adjustment

Check mark

Keel Roller Adjustment for EZ Port MAX

Check mark

Preparation

Check mark

Ensure the following tools are available

Check mark

Roller Adjustment Procedure

Check mark

Loosen 4 screws (Item 3) and remove them.

Check mark

Select the desired roller position

Check mark

Position 1 Adjustment

Check mark

Remove roller (Item 1) and spacers (Item 2).

Check mark

Replace roller as shown in illustration for Position 1.

Run this procedureArrow right

Floating Dock Assembling

Check mark

Preparation

Check mark

Gather necessary tools

Check mark

Alignment and Coupling

Check mark

Align the EZ Port MAX Easy-Lift Entry to the EZ Dock Port MAX Extension

Check mark

Use counter balance weight if necessary

Check mark

Couple the EZ Port MAX Easy-Lift Entry and EZ Dock Port MAX Extension using two EZ Dock Port to Port Coupler Kits

Check mark

Safety Precautions

Check mark

Ensure only flat surfaces are used as walking surfaces

Check mark

Coupler Installation

Run this procedureArrow right

EZ Dock System Maintenance

Check mark

Cleaning

Check mark

Clean the EZ Port MAX using a brush, mild cleaning agent, and water.

Check mark

Use a diluted bleach solution for stubborn stains.

Check mark

Use a power washer if convenient.

Check mark

Ice Management

Check mark

Check if the shoreline area has ice pressure pushes, wind blown ice, or other ice flows.

Check mark

Remove or disconnect the dock from the moorings if ice pressure is present.

Check mark

Remove pipes or piles to prevent bending due to ice pressure.

Check mark

Removal and Storage

Run this procedureArrow right

Parts for EZ Dock Floating Dock 206027BS-**

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Full Bow Section

S26025BS-EZ

Cover, Pipe Bracket Sleeve Beige

S20616EZ

Washer 5/16" SS

117004

Bolt 5/16"-18 x 4-1/2" Truss HD 18-8 SS

80545SS

Bolt 5/16"-18 x 1-1/4" Truss HD 18-8 SS

80514SS

Full Bow Section

S26025BS-EZ

Cover, Pipe Bracket Sleeve Beige

S20616EZ

Washer 5/16" SS

117004

Bolt 5/16"-18 x 4-1/2" Truss HD 18-8 SS

80545SS

Bolt 5/16"-18 x 1-1/4" Truss HD 18-8 SS

80514SS

Full Bow Section

S26025BS-EZ

Cover, Pipe Bracket Sleeve Beige

S20616EZ

Washer 5/16" SS

117004

Bolt 5/16"-18 x 4-1/2" Truss HD 18-8 SS

80545SS

Bolt 5/16"-18 x 1-1/4" Truss HD 18-8 SS

80514SS

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from EZ Dock

Explore Other Assets