

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

EZ Dock Floating Dock 206025BS-**
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Floating Dock Assembling
Preparation
Gather necessary tools
Alignment and Coupling
Align the EZ Port MAX Easy-Lift Entry to an EZ Dock Port MAX Extension
Ensure both parts are level on the water and at the same elevation
Is a counter balance weight needed to offset the installer's weight?
Couple the parts using two EZ Dock Port to Port Coupler Kits
Safety Precautions
Ensure only flat surfaces are used as walking surfaces
Keel Roller Adjustment
Keel Roller Adjustment for EZ Port MAX
Preparation
Gather necessary tools: Phillips Screwdriver
Adjust Keel Roller to Desired Position
Select the desired position for the keel roller
Loosen 4 screws (Item 3) and remove them
For Position 1: Remove roller (Item 1) and spacers (Item 2). Replace roller and place spacers on top of axle plate. Install screws and tighten.
For Position 3: Remove roller (Item 1) and spacers (Item 2). Replace roller and place spacers on top of axle plate. Install screws and tighten.
For Position 4: Remove roller (Item 1). Replace roller with spacers (Item 2) below plate. Install screws and tighten.
Spoke Roller Adjustment
Preparation
Ensure you have the correct model and parts
Adjustment for Long Axel Spoke Roller (250040)
Verify the presence of two spacer links below the roller
Verify the presence of three spacer links above the roller
Is the roller positioned correctly?
Adjustment for Short Axel Spoke Roller (250041)
Verify the presence of one spacer link on each side of the roller
Is the roller positioned correctly?
Bow Section Assembling
Preparation
Ensure all tools are available
Small Bow Section Installation
Insert the small bow section into the holes near the front of the entry section
Install bolts for small bow section
Full Bow Section Installation
Place the full bow section onto the front of the entry section and align it
Install bolts and washers for full bow section
Refer to page 12 for in-line EZ Port MAX applications
EZ Dock System Maintenance
Cleaning
Gather cleaning materials
Clean the EZ Port MAX using a brush, mild cleaning agent, and water
Use a diluted bleach solution for stubborn stains
Use a power washer if convenient
Ice Management
Is there ice pressure in the shoreline area?
Remove or disconnect the dock from the moorings if ice pressure is present
Remove pipes or piles to prevent bending due to ice pressure
Access the parts list for your equipment in MaintainX.
Full Bow Section
S26025BS-EZ
Cover, Pipe Bracket Sleeve Beige
S20616EZ
Washer 5/16" SS
117004
Bolt 5/16"-18 x 4-1/2" Truss HD 18-8 SS
80545SS
Bolt 5/16"-18 x 1-1/4" Truss HD 18-8 SS
80514SS
Full Bow Section
S26025BS-EZ
Cover, Pipe Bracket Sleeve Beige
S20616EZ
Washer 5/16" SS
117004
Bolt 5/16"-18 x 4-1/2" Truss HD 18-8 SS
80545SS
Bolt 5/16"-18 x 1-1/4" Truss HD 18-8 SS
80514SS
Full Bow Section
S26025BS-EZ
Cover, Pipe Bracket Sleeve Beige
S20616EZ
Washer 5/16" SS
117004
Bolt 5/16"-18 x 4-1/2" Truss HD 18-8 SS
80545SS
Bolt 5/16"-18 x 1-1/4" Truss HD 18-8 SS
80514SS
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













