Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Engineered Air HVAC Unit LM-38-K
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Coil Inspection
Coils
Inspect coils and drain pans for cleanliness and biological growth
Clean the external surface of finned coils using a low pressure water spray and a brush
Ensure no high pressure steam or water is used for cleaning coils
Verify cleaning additives or solutions are compatible with coil materials or coatings
Use a fin comb to straighten any damaged or bent fins
Coil Winterization
Drain and blow out water coils with compressed air
Fill and drain coils several times with appropriate strength pre-mixed inhibited HVAC glycol or other suitable fluid
DX Coil Bypass Damper Check
Dx Coil Bypass Dampers
Verify damper settings
Measure the static pressure drop across the DX coil
Does the static pressure drop match the specified value in the Unit Function?
Adjust bypass dampers to match the specified static pressure drop, if necessary
Ensure proper airflow across the DX coil when mechanical cooling is operating
6 Monthly Outdoor Air Intake Inspection
Outdoor Air Intakes, Mixing Sections and Dampers
Check cleanliness of outdoor air intakes, screens, and adjacent areas
Verify integrity of outdoor air intakes, screens, and adjacent areas
Ensure proper operation of outdoor air intakes, screens, and adjacent areas
Adjust dampers if required
Initial Start-Up Check
Before Start-Up
Remove tie-down bolts, straps and blocks
Start-Up Check List
Set all associated electrical switches, controls, thermostats and main disconnect switch to 'OFF' position.
Close all manual valves and field piping valves.
Confirm that all shipping materials have been removed.
Check all bearings, drive and fan set screws for tightness.
Check drive alignment and belt tension.
Inspect all electrical wiring for loose connections.
Initial 2 Weeks Set Screw Check
Set Screws
Check set screws for looseness on the shaft
Tighten set screws where required
Record any observations or issues noted during the check
Refer to Table I for Bearing Setscrew Torques
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX