MaintainX, an Autodesk company
EnterprisePricing
Engineered Air

Engineered Air HVAC Unit LM-3-C

Need answers fast?
Explore the manual using AI.

Engineered Air HVAC Unit LM-3-C
Engineered Air HVAC Unit LM-3-C

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Engineered Air HVAC Unit LM-3-C

Engineered Air HVAC Unit LM-3-C

Create an account to install this asset package.

Maintenance Plans for Engineered Air HVAC Unit Model LM-3-C

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Coil Inspection

Check mark

Coils

Check mark

Inspect coils and drain pans for cleanliness and biological growth

Check mark

Clean external surface of finned coils using low pressure water spray and brush

Check mark

Ensure no high pressure steam or water is used for cleaning

Check mark

Verify cleaning additives or solutions are compatible with coil materials or coatings

Check mark

Use a fin comb to straighten any damaged or bent fins

Check mark

Coil Winterization

Check mark

Drain and blow out water coils with compressed air

Check mark

Fill and drain coils several times with appropriate strength pre-mixed inhibited HVAC glycol or other suitable fluid

Run this procedureArrow right

Initial Set Screw Check

Check mark

Set Screws

Check mark

Check set screws for looseness on the shaft

Check mark

Tighten set screws where required

Check mark

Record any issues found during the check

Check mark

Refer to bearing manufacturers’ literature for torque specifications

Run this procedureArrow right

6 Monthly Unit Maintenance

Check mark

Maintenance

Check mark

Disconnect and lock out power before servicing

Check mark

Ensure no interlock or safety switches are bypassed

Check mark

Is there any mold or biological growth present?

Check mark

Describe the actions taken to remove and sanitize mold or biological growth

Check mark

Attach maintenance history file for the unit

Check mark

Electrical

Check mark

Check all wiring for loose connections

Check mark

Enter the voltage at unit while in operation

Run this procedureArrow right

1 Monthly Fan Bearing Lubrication

Check mark

Lubrication of Fan Bearings

Check mark

Check if the fan bearings are permanently lubricated sealed ball bearings

Check mark

Select the shaft diameter for grease quantity

Check mark

Is the bearing temperature under 158°F (70°C)?

Check mark

Is the environment dusty and wet?

Check mark

Was the bearing greased with a lithium base lubricant?

Check mark

Was the bearing greased while rotating slowly?

Check mark

Was the correct amount of grease applied according to the shaft diameter?

Check mark

Additional notes or observations

Run this procedureArrow right

30 Monthly Fan Bearing Lubrication

Check mark

Lubrication of Fan Bearings

Check mark

Check if the fan has permanently lubricated sealed ball bearings

Check mark

Is the bearing rotating slowly during lubrication?

Check mark

Select the shaft diameter to determine grease quantity

Check mark

Is lithium base lubricant used?

Check mark

Is the grease quantity appropriate for the selected shaft diameter?

Check mark

Are extended lubrication lines provided and tubing not factory filled?

Check mark

Refer to the fan and/or bearing manufacturers’ literature for additional information

Check mark

Check the conditions chart for re-greasing interval

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Engineered Air

Explore Other Assets