MaintainX, an Autodesk company
EnterprisePricing
Engineered Air

Engineered Air HVAC Unit LM-26-K

Need answers fast?
Explore the manual using AI.

Engineered Air HVAC Unit LM-26-K
Engineered Air HVAC Unit LM-26-K

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Engineered Air HVAC Unit LM-26-K

Engineered Air HVAC Unit LM-26-K

Create an account to install this asset package.

Maintenance Plans for Engineered Air HVAC Unit Model LM-26-K

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Electric Heat Check

Check mark

Electric Heat — Electrical Inspection

Check mark

Check and tighten all electrical connections

Run this procedureArrow right

1 Monthly Dodge Ball Bearing Pillow Block Lubrication

Check mark

Lubrication of Dodge Fan Bearings — Ball Bearing Pillow Block

Check mark

Select the shaft diameter and speed (RPM) for lubrication schedule

Check mark

Is it safe to re-lubricate while running?

Check mark

Re-lubricate while running until some purging occurs at seals

Check mark

Adjust lubrication frequency based on purged grease condition

Check mark

Record hours of operation, temperature, and surrounding conditions

Check mark

Is the operation 24 hours?

Check mark

Select the grease used for lubrication

Check mark

Lubricate bearings prior to extended shutdown or storage

Run this procedureArrow right

1 Weekly Dodge Spherical Roller Solid Pillow Block Lubrication

Check mark

Lubrication of Dodge Fan Bearings — Spherical Roller Bearing, Solid Pillow Block

Check mark

Determine re-lubrication schedule based on shaft diameter and speed (RPM)

Check mark

Is it safe to re-lubricate while running?

Check mark

Re-lubricate while running until some purging occurs at seals

Check mark

Adjust lubrication frequency based on condition of purged grease

Check mark

Double lubrication frequency for 24-hour operation

Check mark

Lubricate with multipurpose roller bearing NLGI No. 2

Check mark

Select lubricant example used

Check mark

Lubricate bearings prior to extended shutdown or storage

Run this procedureArrow right

30 Monthly Fan Bearing Lubrication

Check mark

Lubrication of Fan Bearings

Check mark

Check if the fan has permanently lubricated sealed ball bearings

Check mark

Is the bearing rotating slowly during lubrication?

Check mark

Use lithium base lubricant for greasing

Check mark

Ensure not to overgrease the bearings

Check mark

Avoid using non-lithium based grease

Check mark

Select the shaft diameter and apply the correct grease quantity

Check mark

Refer to the fan and/or bearing manufacturers’ literature for additional information

Check mark

Verify conditions for re-greasing interval

Run this procedureArrow right

Initial Start-Up Check

Check mark

Before Start-Up

Check mark

Remove tie-down bolts, straps and blocks

Check mark

Start-Up Check List

Check mark

Set all associated electrical switches, controls, thermostats and main disconnect switch to 'OFF' position.

Check mark

Close all manual valves and field piping valves.

Check mark

Confirm that all shipping materials have been removed.

Check mark

Check all bearings, drive and fan set screws for tightness.

Check mark

Check drive alignment and belt tension.

Check mark

Inspect all electrical wiring for loose connections.

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Engineered Air

Explore Other Assets