Manual for Engineered Air HVAC Unit DJ-60

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Engineered Air HVAC Unit DJ-60

Engineered Air HVAC Unit DJ-60

Create an account to install this asset package.

Maintenance Plans for Engineered Air HVAC Unit Model DJ-60

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Motor Lubrication

Check mark

Motor Lubrication

Check mark

Refer to motor manufacturer for lubrication recommendations

Check mark

Remove grease drain plugs and operate motor for 15 minutes before replacing plugs

Check mark

Ensure not to over grease the motor

Check mark

Note any severe conditions affecting motor operation

Check mark

Recommended Motor Lubrication Intervals for motors 10-40 HP (7.5-29.8 kW)

Run this procedureArrow right

1 Monthly VFD Enclosure Filter Maintenance

Check mark

VFD Enclosure

Check mark

Verify the presence of filters on the air inlet of VFD enclosures

Check mark

Is the filter replacement based on calendar scheduling?

Check mark

Enter the scheduled interval for filter replacement (in months)

Check mark

Is the filter replacement based on visual inspection?

Check mark

Inspect the filters for pollutant loading

Check mark

Replace filters if necessary

Run this procedureArrow right

1 Yearly Fan Bearing Lubrication

Check mark

Lubrication of Fan Bearings

Check mark

Check the type of fan bearings

Check mark

Is the bearing rotating slowly during lubrication?

Check mark

Is a lithium base lubricant being used?

Check mark

Are extended lubrication lines provided?

Check mark

Enter the shaft diameter in inches

Check mark

Enter the grease quantity used in ounces

Check mark

Is the bearing temperature under 120°F (50°C) in a dusty environment?

Check mark

Is the bearing temperature under 158°F (70°C) in a clean environment?

Run this procedureArrow right

1 Monthly Fan Bearing Lubrication

Check mark

Lubrication of Fan Bearings

Check mark

Check the type of fan bearings

Check mark

Is the bearing rotating slowly during lubrication?

Check mark

Is a lithium base lubricant being used?

Check mark

Enter the shaft diameter in inches

Check mark

Enter the grease quantity used in ounces

Check mark

Is the grease quantity correct according to the shaft diameter?

Check mark

Are extended lubrication lines provided?

Check mark

Is the tubing factory filled?

Run this procedureArrow right

1 Yearly Safety Shutoff Valve Testing

Check mark

Safety Shutoff Valve Leak Test

Check mark

De-energize the control system

Check mark

Close the upstream manual gas valve

Check mark

Connect a ¼” (6mm) tube to the outlet pressure tap on the safety shutoff valve

Check mark

Immerse the opposite end of the ¼” (6mm) tube vertically ½” (13mm) into a clear container of water

Check mark

Count the number of bubbles appearing during a 10 second period

Check mark

Is the bubble rate greater than that noted in the manufacturer's table?

Check mark

If the bubble rate is greater than noted, choose the action taken

Check mark

If bubble rate is less than noted, remove the ¼” (6mm) tube and reconnect the outlet pressure tap plug

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Engineered Air

Explore Other Assets