

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Engineered Air HVAC Unit DJ-20
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Unit Maintenance
Maintenance
WARNING — High Voltage and Moving Parts
Disconnect and lock out power before servicing
Do not bypass any interlock or safety switches
Follow cleaning instructions to reduce risk of mold or bacterial growth
Document any mold or biological growth issues and actions taken
Label all wires prior to removal when servicing controls or critical components
Verify proper operation after servicing
Electrical
9 Monthly Motor Lubrication
Motor Lubrication
Refer to motor manufacturer for lubrication recommendations
Remove grease drain plugs and operate motor for 15 minutes before replacing plugs
Ensure not to over grease the motor
Note any severe conditions affecting motor operation
Select the motor lubrication interval based on service hours per day
1 Yearly Coil Inspection
Coils
Inspect coils and drain pans for cleanliness and biological growth
Clean the external surface of finned coils using a low pressure water spray and a brush
Ensure cleaning additives or solutions are compatible with coil materials or coatings
Use a fin comb to straighten any damaged or bent fins
Coil Winterization
Drain and blow out water coils with compressed air
Fill and drain coils several times with appropriate strength pre-mixed inhibited HVAC glycol or other suitable fluid
Ensure propylene glycol is not used with CPVC piping
6 Monthly Unit Maintenance
Control Enclosure Ventilation
Adjust the slide damper for seasonal operation
Outdoor Air Intakes, Mixing Sections and Dampers
Check the following for cleanliness, integrity, and proper operation
Adjust dampers where required
1 Monthly VFD Enclosure Filter Maintenance
VFD Enclosure
Check the condition of the filters
Is the filter due for a scheduled change?
Replace the filter if necessary
Record the date of filter inspection and replacement
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













