Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Engineered Air Fan Coil VFC
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2 Yearly Belt Drive Motor Lubrication
Preparation
Remove grease drain plugs from the motor
Operate the motor for 15 minutes before replacing plugs
Lubrication Guidelines
Recommended Motor Lubrication Intervals
Is the motor running in severe conditions?
Specify lubrication frequency if running in severe conditions
Post-Lubrication
Replace grease drain plugs
1 Monthly Filter Inspection
Filter Inspection Preparation
Review submittal record for filter quantities, sizes, and types
Is the unit operating with high levels of outside air?
Filter Inspection and Cleaning
Inspect filters for the following conditions
Check if filters are plugged or excessively dirty
Remove filters if operating in heavy frost or snow areas during winter months
Clean high velocity permanent filters by rinsing with water and shaking off excess water
Filter Replacement
Initial 2 Weeks Electric Heater Electrical Check
Warning: High Voltage and Moving Parts
Safety Precautions
Ensure power is disconnected before servicing
Verify that no interlock or safety switches are bypassed
Electrical Connections Check
Check and tighten all electrical connections to
Were all connections secure after tightening?
Post-Check Actions
Reconnect power after servicing
Heresite Coating Repair
Surface Preparation
Ensure surfaces are completely dry
Use a nylon brush to remove any loose scale
Roughen up areas to be repaired with a wire brush
Vacuum fins or the affected area to ensure any loose residue is gone
Cleaning
Spray or brush Heresite® S-440 solvent (or equivalent cleaner) to dissolve any oils or grease
Vacuum the affected area again
Allow one hour for the solvent to dissolve completely
Initial 4 Months Electric Heater Electrical Check
Warning: High Voltage and Moving Parts
Ensure power is disconnected before servicing
Verify all interlock and safety switches are engaged
Electrical Connections Check
Check and tighten electrical connections to the following components
Were all connections secure after tightening?
Post-Check Verification
Is the power restored safely after servicing?
Technician's signature
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX