MaintainX Logo
EnterprisePricing
Doosan

Doosan Doosan Generator G25WMI-2A-T2 (B54) G25WMI-2A-T2 (B54)

Need answers fast?
Explore the manual using AI.

Doosan Doosan Generator G25WMI-2A-T2 (B54) G25WMI-2A-T2 (B54)
Doosan Doosan Generator G25WMI-2A-T2 (B54) G25WMI-2A-T2 (B54)

The Doosan Generator G25WMI-2A-T2 (B54) is a reliable industrial generator designed for efficient power generation. Known for its durability and performance, this generator is ideal for various applications, ensuring consistent energy supply in demanding environments.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Doosan Doosan Generator G25WMI-2A-T2 (B54) G25WMI-2A-T2 (B54)

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Doosan Doosan Generator G25WMI-2A-T2 (B54) G25WMI-2A-T2 (B54)

Doosan Doosan Generator G25WMI-2A-T2 (B54) G25WMI-2A-T2 (B54)

Create an account to install this asset package.

Maintenance Plans for Doosan Doosan Generator G25WMI-2A-T2 (B54) Model G25WMI-2A-T2 (B54)

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Engine Maintenance

Check mark

1. Fuel/Water Separator

Check mark

• Every six months or 500 hours, or less if fuel is of poor quality or contaminated, replace the bowl elements(s).

Check mark

2. Engine Radiator

Check mark

• The engine coolant system is normally filled with a 50/50 mixture of water and ethylene glycol.

Check mark

• This permanent type anti-freeze contains rust inhibitors and provides protection to -35°F (-37°C). The use of such a mixture is recommended for both summer and winter operation.

Check mark

• When using water alone, be sure to add a reputable brand of rust inhibitor to prevent internal corrosion.

Check mark

• It is recommended to test the freezing protection of the coolant every six months or prior to freezing temperatures. Replenish with a fresh mixture every twelve months.

Check mark

3. Check Control Compartment (Interior).

Check mark

4. Drain Fuel Tank.

Run this procedureArrow right

1 Weekly Engine Check

Check mark

1. Tires

Check mark

• Weekly check the condition of the tires, and gauge the air pressure. Tires that have cuts or cracks or little tread should be repaired or replaced.

Check mark

2. Check Precleaner Dumps.

Check mark

3. Check Battery Connections.;

Run this procedureArrow right

Alternator Maintenance

Check mark

Safety Measures

Check mark

• Servicing or troubleshooting must be carried out strictly in accordance with instructions so as to avoid the risk of accidents and to maintain the machine in its original state.

Check mark

• All such operations performed on the alternator should be undertaken by personnel with training of electrical and mechanical components.

Check mark

• Before any intervention on the machine, ensure that it cannot be started by a manual or automatic system and that you have understood the operating principles of the system.

Check mark

1. Cooling circuit

Check mark

• It is advisable to check that circulation of air is not reduced by partial blocking of the suction and discharge louvres: mud, fibre, grease, etc.

Check mark

2. Electrical servicing

Check mark

• Cleaning product for the windings

Check mark

WARNING! Do not use: Trichlorethylene, perchlorethylene, trichloroethane and any alkaline products.

Run this procedureArrow right

250 Hourly / 3 Monthly Engine Maintenance

Check mark

1. Voltage Selector Door Interlock Switch

Check mark

• Every three months or 250 operating hours, the interlock switch should be checked. Running with no electric load, open the VOLTAGE SELECTOR door. This will shutdown the engine and trip the main breaker. To reset, close the door.

Check mark

2. High Containment Fluid Alarm System

Check mark

• The operation of the high containment fluid alarm system should be checked every 3 months or whenever it appears not to be operating properly.

Check mark

• The level switch is located at the lower end of a pipe at the bottom of the containment tank.

Check mark

• Test the switch by unfastening the u-bolts holding the pipe, and then inverting the pipe to allow the switch float to fall.

Check mark

• The “High Containment Level” LED should illuminate. Replace any defective switch.

Check mark

• Drain the containment area using the drain plug at either end of the containment basin.;

Run this procedureArrow right

500 Hourly / 3 Monthly Air Cleaner Maintenance

Check mark

Proper maintenance of the air cleaner provides maximum protection against airborne dust.

Check mark

Squeeze the rubber valve (precleaner dirt dump periodically to ensure that it is not clogged).

Check mark

To service the air cleaners, proceed as follows:

Check mark

Remove filter element.

Check mark

Inspect air cleaner housing for any condition that might cause a leak and correct as necessary.

Check mark

Wipe inside of air cleaner housing with a clean, damp cloth to remove any dirt accumulation. This will permit better seal for gasket on filter element.

Check mark

Install element.

Check mark

The air cleaner assembly (housing) should be inspected every 3 months or 500 hours for any leakage paths.

Check mark

Make sure the inlet is free from obstruction.

Run this procedureArrow right

Parts for Doosan Doosan Generator G25WMI-2A-T2 (B54) G25WMI-2A-T2 (B54)

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

500 Hour Maintenance Kit (without fluids)

44003952

250 Hour Maintenance Kit (without fluids)

44003945

Protec Eng Fluid - 1 gal

36875938

250 Hour Maintenance Kit (& engine fluids)

44003663

Fuel Water Separator Element

54525530

500 Hour Maintenance Kit (without fluids)

44003952

250 Hour Maintenance Kit (without fluids)

44003945

Protec Eng Fluid - 1 gal

36875938

250 Hour Maintenance Kit (& engine fluids)

44003663

Fuel Water Separator Element

54525530

500 Hour Maintenance Kit (without fluids)

44003952

250 Hour Maintenance Kit (without fluids)

44003945

Protec Eng Fluid - 1 gal

36875938

250 Hour Maintenance Kit (& engine fluids)

44003663

Fuel Water Separator Element

54525530

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Doosan

Explore Other Assets